State
|
Plant
|
Company
|
MW
|
Annual CO2 (tons)
|
Type
|
Status
|
Year
|
Type
|
Sources
|
Notes
|
Andhra Pradesh |
Adilabad Power Station Unit 1 |
Singareni Collieries |
600 |
3,548,220 |
|
Construction |
2012 |
|
http://bit.ly/wxz7JS |
|
Andhra Pradesh |
Adilabad Power Station Unit 2 |
Singareni Collieries |
600 |
3,548,220 |
|
Early development |
2016 |
|
http://bit.ly/wxz7JS |
|
Andhra Pradesh |
Adilibad power station (Shalivahana Power Corp.) |
Shalivahana Power Corp. |
300 |
1,774,110 |
|
Uncertain |
|
|
http://bit.ly/zzBc5r |
IPP list
|
Andhra Pradesh |
Ankulapatur power station phase 1 |
VSF Projects |
350 |
2,069,795 |
Supercritical |
Construction |
|
Supercritical |
|
|
Andhra Pradesh |
Ankulapatur power station phase 2 |
VSF Projects |
135 |
798,350 |
Supercritical |
Proposed |
|
Supercritical |
|
|
Andhra Pradesh |
Bander power station Phase-I |
Thermal Powertech Corporation |
660 |
3,903,043 |
Supercritical |
Construction |
2013 |
Supercritical |
http://bit.ly/AvgLcI |
|
Andhra Pradesh |
Bander power station Phase-II |
Thermal Powertech Corporation |
660 |
3,903,043 |
Supercritical |
Construction |
2013 |
Supercritical |
http://bit.ly/AvgLcI |
|
Andhra Pradesh |
Bhavanapadu Thermal Power Project (Kakarapalle) |
East Coast Energy |
2640 |
15,612,170 |
Supercritical |
Deferred |
|
Supercritical |
|
|
Andhra Pradesh |
Bhavavipuram Cement power station |
Deccan Cements |
18 |
106,447 |
|
Construction |
|
|
|
|
Andhra Pradesh |
Budele power station |
Indu Projects Limited |
1000 |
5,913,701 |
|
Unconfirmed |
|
|
http://bit.ly/zzBc5r |
IPP list, not on company website
|
Andhra Pradesh |
Damodaram Sanjeevaiah Thermal Power Station (Krishnapatnam) |
Andhra Pradesh Power Generation Corporation (APGENCO) |
1600 |
9,461,921 |
Supercritical |
Construction |
|
Supercritical |
http://bit.ly/xFx1v6 |
0
|
Andhra Pradesh |
Damodaram Sanjeevaiah Thermal Power Station (Krishnapatnam) expansion |
Andhra Pradesh Power Generation Corporation (APGENCO) |
2400 |
14,192,882 |
Supercritical |
Cancelled |
0 |
Supercritical |
0 |
0
|
Andhra Pradesh |
Dharmavaram power station |
Nava Bharat Ventures Ltd |
150 |
887,055 |
|
Deferred |
|
|
|
|
Andhra Pradesh |
Dr. RKP Power Ankulapatur power station phase 1 |
Dr. RKP Power |
130 |
768,781 |
|
Advanced development |
|
|
|
|
Andhra Pradesh |
Dr. RKP Power Ankulapatur power station phase 2 |
Dr. RKP Power |
300 |
1,774,110 |
|
Advanced development |
|
|
|
|
Andhra Pradesh |
Garividi power station |
Facor Power |
45 |
266,117 |
|
Construction |
|
|
|
|
Andhra Pradesh |
Gopuvanipalam Mega Thermal Power Project (Chinnapuram, Machilipatnam) |
Nagarjuna Construction Company |
1980 |
11,709,128 |
Supercritical |
Unconfirmed |
|
Supercritical |
http://bit.ly/xRl30s, http://bit.ly/zzBc5r |
IPP list, not on company website
|
Andhra Pradesh |
Gudur Thermal Power Project (Momidi) Phase I |
Pragdisa Power Private Ltd |
1320 |
7,806,085 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/wRBQGw |
|
Andhra Pradesh |
Gudur Thermal Power Project (Momidi) Phase II |
Pragdisa Power Private Ltd |
1320 |
7,806,085 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/yxjnkY |
|
Andhra Pradesh |
Gunipudi power station (NBPL proposal) |
Namratha Bizili Private Limited |
300 |
1,774,110 |
|
Deferred |
|
|
0 |
|
Andhra Pradesh |
Gunipudi power station (STEAPL proposal) |
Suryachakra Group |
1320 |
7,806,085 |
Ultra Supercritical |
Advanced development |
|
Ultra Supercritical |
0 |
|
Andhra Pradesh |
Hinduja Power Plant |
Hinduja National Power Corporation |
1040 |
6,150,249 |
|
Deferred |
|
|
0 |
|
Andhra Pradesh |
Hindupur power station |
Sheshadri Power & Infrastructure |
1320 |
7,806,085 |
|
Unconfirmed |
|
|
http://bit.ly/wlA2Xp, http://bit.ly/zzBc5r |
|
Andhra Pradesh |
Jaipur power station |
Singareni Collieries |
600 |
3,548,220 |
|
Construction |
2013 |
|
http://bit.ly/wLLYbH |
|
Andhra Pradesh |
Jharapudi power station |
Suryachakra Group |
140 |
827,918 |
|
Unconfirmed |
|
|
0 |
|
Andhra Pradesh |
Kakatiya Thermal Power Project Stage-II |
Andhra Pradesh Power Generation Corporation (APGENCO) |
600 |
3,548,220 |
|
Construction |
2012 |
|
http://bit.ly/xvrQbr |
|
Andhra Pradesh |
Kineta Power Stage I (Krishnapatnam) |
Kineta Power Limited |
1320 |
7,806,085 |
Supercritical |
Advanced development |
|
Supercritical |
0 |
|
Andhra Pradesh |
Kineta Power Stage II (Krishnapatnam) |
Kineta Power Limited |
660 |
3,903,043 |
Supercritical |
Proposed |
|
Supercritical |
0 |
|
Andhra Pradesh |
Komarada power station |
Alfa Infraprop Pvt. Ltd. |
2640 |
15,612,170 |
Supercritical |
Proposed |
|
Supercritical |
0 |
|
Andhra Pradesh |
Kotapally power station (SKIL Group) |
SKIL Group |
600 |
3,548,220 |
0 |
Unconfirmed |
0 |
0 |
0 |
0
|
Andhra Pradesh |
Kothagudem Phase V Unit 10 |
Andhra Pradesh Power Generation Corporation (APGENCO) |
500 |
2,956,850 |
|
Operating |
2011 |
|
0 |
|
Andhra Pradesh |
Kothagudem Phase VI Unit 11 |
Andhra Pradesh Power Generation Corporation (APGENCO) |
500 |
2,956,850 |
0 |
Operating |
2011 |
0 |
0 |
0
|
Andhra Pradesh |
Kothagudem TPS expansion |
Andhra Pradesh Power Generation Corporation (APGENCO) |
800 |
4,730,961 |
|
Proposed |
|
|
http://bit.ly/ztrAMS |
0
|
Andhra Pradesh |
Krishnapatnam Navayuga thermal station Phase I |
Navayuga Power |
1320 |
7,806,085 |
Supercritical |
Advanced development |
2014 |
Supercritical |
0 |
|
Andhra Pradesh |
Krishnapatnam Navayuga thermal station Phase II |
Navayuga Power |
660 |
3,903,043 |
Supercritical |
Proposed |
|
Supercritical |
0 |
|
Andhra Pradesh |
Krishnapatnam Ultra Mega Power Project 1-2 |
Reliance Power |
1320 |
7,806,085 |
|
Deferred |
2013 |
|
http://bit.ly/zzBc5r |
|
Andhra Pradesh |
Krishnapatnam Ultra Mega Power Project 3-6 |
Reliance Power |
2640 |
15,612,170 |
|
Deferred |
2015 |
|
http://bit.ly/zzBc5r |
|
Andhra Pradesh |
Latchayapeta power station |
NCS Sugars Ltd. |
600 |
3,548,220 |
|
Proposed |
|
|
0 |
|
Andhra Pradesh |
Lovapalem power station |
My Home Power Ltd. |
1000 |
5,913,701 |
|
Unconfirmed |
|
|
http://bit.ly/zzBc5r |
IPP list
|
Andhra Pradesh |
Meenakshi Energy Thermal Power Project Phase-I |
Meenakshi Energy |
540 |
3,193,398 |
|
Operating |
2010 |
|
http://bit.ly/yBTWyk |
|
Andhra Pradesh |
Meenakshi Energy Thermal Power Project Phase-II |
Meenakshi Energy |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/zzBc5r, http://bit.ly/xJMad9, http://bit.ly/AoPRzj |
MW amounts vary among sources; coal supplies in doubt
|
Andhra Pradesh |
Meghavaram Kakarapalli power station |
Meghavaram Power |
450 |
2,661,165 |
|
Deferred |
|
|
0 |
|
Andhra Pradesh |
Meherpur power station |
Usha Martin |
1200 |
7,096,441 |
|
Uncertain |
|
|
http://bit.ly/xqz4Cl |
1200 - 1320 MW
|
Andhra Pradesh |
Muthukur Mandal power station (Painampuram) |
Nelcast Energy Corporation Ltd |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/zzBc5r, http://bit.ly/y0y9mF |
0
|
Andhra Pradesh |
Nagarjuna Construction Company Sompeta Thermal Plant |
Nagarjuna Construction Company |
2640 |
15,612,170 |
|
Deferred |
|
|
0 |
|
Andhra Pradesh |
NCC Vamsadhara Mega Power Project |
Nagarjuna Construction Company |
1960 |
11,590,854 |
|
Unconfirmed |
|
|
http://bit.ly/zwlfZC |
|
Andhra Pradesh |
Ontimavadi power station |
GMR Energy |
6300 |
37,256,315 |
|
Proposed |
|
|
http://bit.ly/yqUBvK, http://bit.ly/zzBc5r |
TOR issued
|
Andhra Pradesh |
Paloncha power station expansion #1 |
Nava Bharat Ventures Ltd |
150 |
887,055 |
|
Construction |
|
|
http://bit.ly/zcPiD6, http://bit.ly/wuGJL9 |
adding to existing station
|
Andhra Pradesh |
Paloncha power station expansion #2 |
Nava Bharat Ventures Ltd |
150 |
887,055 |
|
Proposed |
|
|
http://bit.ly/zcPiD6, http://bit.ly/zzBc5r |
second addition to existing station
|
Andhra Pradesh |
Pegadapalli (Jaipur Mandal) power station |
Singareni Collieries |
600 |
3,548,220 |
|
Construction |
|
|
0 |
|
Andhra Pradesh |
Pentakota power station |
Namratha Bizili Private Limited |
150 |
887,055 |
|
Deferred |
|
|
0 |
|
Andhra Pradesh |
Pentakota power station (Srinivasam Energy) |
Srinivasam Energy Limited |
1320 |
7,806,085 |
Supercritical |
Unconfirmed |
|
Supercritical |
0 |
|
Andhra Pradesh |
Pudimadaka Ultra Mega Power Project |
NTPC |
4000 |
23,654,803 |
Supercritical |
Advanced development |
|
Supercritical |
0 |
|
Andhra Pradesh |
Ramagundam Stage-IV |
NTPC |
1000 |
5,913,701 |
|
Early development |
|
|
http://bit.ly/A6lTxy |
|
Andhra Pradesh |
Rayalaseema Thermal Power Project Stage-III (Unit 5) |
Andhra Pradesh Power Generation Corporation (APGENCO) |
210 |
1,241,877 |
|
Operating |
2010 |
|
http://bit.ly/xvrQbr |
|
Andhra Pradesh |
Rayalaseema Thermal Power Project Stage-IV (Unit 6) |
Andhra Pradesh Power Generation Corporation (APGENCO) |
600 |
3,548,220 |
|
Advanced development |
2014 |
|
http://bit.ly/xvrQbr |
|
Andhra Pradesh |
Saggonda power station |
Andhra Sugars |
120 |
709,644 |
|
Proposed |
|
|
http://bit.ly/xly2og |
|
Andhra Pradesh |
Sattupally Thermal Power Station |
Andhra Pradesh Power Generation Corporation (APGENCO) |
600 |
3,548,220 |
|
Early development |
|
|
http://bit.ly/xvrQbr |
|
Andhra Pradesh |
Sigma Infrarop power station (Khamman) |
Sigma Infrarop Ltd |
2640 |
15,612,170 |
|
Unconfirmed |
|
|
http://bit.ly/zzBc5r |
|
Andhra Pradesh |
Simhadri power station unit 3 |
NTPC |
500 |
2,956,850 |
|
Operating |
2011 |
|
0 |
0
|
Andhra Pradesh |
Simhadri power station unit 4 |
NTPC |
500 |
2,956,850 |
|
Proposed |
|
|
http://bit.ly/AsI4Ed |
0
|
Andhra Pradesh |
Sompeta power station (Suryachakra) |
Suryachakra Group |
1200 |
7,096,441 |
|
Unconfirmed |
|
|
http://bit.ly/zzBc5r |
IPP list, not on company website
|
Andhra Pradesh |
Sree Siva Satyadeva Power Plant |
Sree Siva Satyadeva Power Plant Pvt. |
2000 |
11,827,402 |
|
Cancelled |
|
|
0 |
|
Andhra Pradesh |
Sri Damodaram Sanjeevaiah (Krishnapatnam) Thermal Power Station |
Andhra Pradesh Power Generation Corporation (APGENCO) |
1600 |
9,461,921 |
|
Construction |
2012 |
|
http://bit.ly/xvrQbr |
|
Andhra Pradesh |
Srikakulam Thermal Power Station |
Andhra Pradesh Power Generation Corporation (APGENCO) |
2400 |
14,192,882 |
|
Early development |
|
|
http://bit.ly/xvrQbr |
|
Andhra Pradesh |
Thamminapatnam power station (Simhapuri) Phase-I |
Simhapuri Energy |
300 |
1,774,110 |
Subcritical |
Construction |
2012 |
Subcritical |
http://bit.ly/zBii7p |
|
Andhra Pradesh |
Thamminapatnam power station (Simhapuri) Phase-II |
Simhapuri Energy |
300 |
1,774,110 |
Subcritical |
Construction |
2012 |
Subcritical |
http://bit.ly/zBii7p |
|
Andhra Pradesh |
Thamminapatnam power station (Simhapuri) Phase-III |
Simhapuri Energy |
1320 |
7,806,085 |
Supercritical |
Construction |
2013 |
Supercritical |
http://bit.ly/zBii7p |
|
Andhra Pradesh |
Uppada power station |
Spectrum Power Generation |
1320 |
7,806,085 |
|
Cancelled |
|
|
http://bit.ly/zzBc5r |
0
|
Andhra Pradesh |
Vadarevu Ultra Mega Power Project Stages II-III |
Andhra Pradesh Power Generation Corporation (APGENCO) |
2400 |
14,192,882 |
|
Proposed |
|
|
http://bit.ly/xvrQbr |
|
Andhra Pradesh |
Varadevu Ultra Mega Power Project Stage I |
Andhra Pradesh Power Generation Corporation (APGENCO) |
1600 |
9,461,921 |
|
Early development |
|
|
0 |
|
Andhra Pradesh |
VBF Ferro Alloys Bodepalli plant |
VBC Ferro Alloys |
120 |
709,644 |
|
Proposed |
|
|
http://bit.ly/z7RTFV |
|
Andhra Pradesh |
Vijayawada Thermal Power Station (IGCC) |
Andhra Pradesh Power Generation Corporation (APGENCO) |
182 |
1,076,294 |
IGCC |
Early development |
2014 |
IGCC |
0 |
|
Andhra Pradesh |
Vijayawada Thermal Power Station expansion |
Andhra Pradesh Power Generation Corporation (APGENCO) |
800 |
4,730,961 |
|
Proposed |
|
|
http://bit.ly/ztrAMS |
0
|
Andhra Pradesh |
Vikas Power thermal plant |
Vikas Power |
540 |
3,193,398 |
|
Proposed |
|
|
0 |
|
Andhra Pradesh |
Welspun Andhra Pradesh project |
Welspun Energy |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/xlX6mJ |
0
|
Assam |
Bongaigaon power station Stage I |
NTPC |
750 |
4,435,276 |
|
Construction |
|
|
http://bit.ly/ylv3tQ |
|
Assam |
Bongaigaon power station Stage II |
NTPC |
250 |
1,478,425 |
|
Proposed |
|
|
http://bit.ly/ylv3tQ |
|
Assam |
Borgolai power station |
Assam Power Projects Development Company Ltd |
250 |
1,478,425 |
|
Proposed |
|
|
http://bit.ly/yNgcMj |
|
Assam |
Margherita power station |
NEEPCO and APGCL |
480 |
2,838,576 |
|
Proposed |
|
|
http://bit.ly/zb6oe1 |
|
Assam |
Naitor power station |
Globe Power & Steel |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/xPhwWR, http://bit.ly/zzBc5r |
|
Bihar |
Banka Power Project |
Abhijeet Group |
3960 |
23,418,255 |
|
Uncertain |
2014 |
|
0 |
|
Bihar |
Barauni power station expansion |
Bihar State Electricity Board |
500 |
2,956,850 |
|
Early development |
2014 |
|
http://bit.ly/xqz4Cl |
|
Bihar |
Barh I power station |
NTPC |
1980 |
11,709,128 |
|
Construction |
|
|
0 |
Delayed to 2013-14
|
Bihar |
Barh II power station |
NTPC |
1320 |
7,806,085 |
Supercritical |
Construction |
|
Supercritical |
0 |
Delayed to 2013-14
|
Bihar |
Bhagalpur Power Project |
Ganga Power & Natural Resources |
2640 |
15,612,170 |
|
Early development |
|
|
0 |
|
Bihar |
Bihar Sponge Iron power station |
Modi Group |
25 |
147,843 |
|
Proposed |
|
|
0 |
|
Bihar |
Buxar Thermal Power Station (Chausa) |
Buxar Bijlee Company |
1320 |
7,806,085 |
|
Early development |
2016 |
|
http://bit.ly/wNMApy, http://bit.ly/xqz4Cl |
|
Bihar |
Chausa power station |
Krishak Bharti Co-operative Ltd. |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/xqz4Cl |
|
Bihar |
Indragachi power station |
India Power Corporation |
1320 |
7,806,085 |
|
Early development |
2015 |
|
http://bit.ly/xqz4Cl |
|
Bihar |
Jagdishpur power station Stage 1 |
AES India |
1320 |
7,806,085 |
|
Early development |
2016 |
|
0 |
|
Bihar |
Jagdishpur power station Stage 2 |
AES India |
1320 |
7,806,085 |
|
Proposed |
|
|
0 |
0
|
Bihar |
Kahalgaon power station (East-West Power) |
East-West Power Generation Co. Ltd. |
1000 |
5,913,701 |
|
Cancelled |
|
|
http://bit.ly/xqz4Cl |
|
Bihar |
Kahalgaon power station (Sarvottam) |
Sarvottam Infrastructure |
540 |
3,193,398 |
|
Cancelled |
|
|
http://bit.ly/zzBc5r |
|
Bihar |
Kahalgaon power station expansion |
Cement Manufacturing Company Ltd. |
500 |
2,956,850 |
|
Uncertain |
|
|
http://bit.ly/xqz4Cl |
|
Bihar |
Kahalgaon Super Thermal Power Plant St-III Extension |
NTPC |
500 |
2,956,850 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
|
Bihar |
Kiul Thermal Power Project (Lakhisarai) |
Mirach Power Pvt. Ltd |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
|
Bihar |
Kochar power station |
Triton Energy Ltd. |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/xqz4Cl |
|
Bihar |
Lakhisarai power station (SPML) |
SPML |
1200 |
7,096,441 |
|
Proposed |
|
|
http://bit.ly/xqz4Cl |
|
Bihar |
Lakhisarai Thermal Power Station (Kajara) |
Lakhisarai Bijlee |
1320 |
7,806,085 |
|
Advanced development |
2016 |
|
http://bit.ly/wNMApy, http://bit.ly/xqz4Cl |
|
Bihar |
MIRACH Jagdishpur power station |
Mirach Power Pvt. Ltd |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Bihar |
Muzaffarpur power station extension |
Bihar State Electricity Board |
390 |
2,306,343 |
|
Construction |
2013 |
|
http://bit.ly/xqz4Cl |
|
Bihar |
Nabinagar (Majhiyan) Super Thermal Power Project |
Nabinagar Power Generating Company |
1980 |
11,709,128 |
Supercritical |
Construction |
2016 |
Supercritical |
http://bit.ly/AzVAs1, http://bit.ly/xqz4Cl |
|
Bihar |
Nabinagar I power station |
NTPC and Ministry of Railways |
1000 |
5,913,701 |
|
Construction |
|
|
0 |
|
Bihar |
Nalanda power station |
Nalanda Power Company Ltd |
2000 |
11,827,402 |
|
Proposed |
2016 |
|
http://bit.ly/xqz4Cl |
|
Bihar |
Pirpainti power station (CESC) |
CESC |
2000 |
11,827,402 |
|
Proposed |
2017 |
|
http://bit.ly/Aj1aPB |
0
|
Bihar |
Pirpainti power station (Essar) |
Essar Energy |
1800 |
10,644,661 |
|
Uncertain |
|
|
http://bit.ly/xqz4Cl |
|
Bihar |
Pirpainti Thermal Power Station |
Pirpainti Bijlee Company |
1320 |
7,806,085 |
|
Early development |
2016 |
|
http://bit.ly/xqz4Cl |
|
Bihar |
Prabhawati Nagar power station |
Arrissan Power Limited |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/xqz4Cl |
|
Bihar |
Sirdala power station |
Global Powmin |
2640 |
15,612,170 |
|
Early development |
2014 |
|
http://bit.ly/xqz4Cl |
|
Bihar |
South Pirpainti Thermal Power Station |
Nalanda Power Company |
2000 |
11,827,402 |
|
Early development |
|
|
0 |
|
Chhattisgarh |
Akaltara Ultra Mega Power Project |
Akaltara Power |
4000 |
23,654,803 |
|
Deferred |
|
|
0 |
|
Chhattisgarh |
Amarkantak Power Phase I (Pathadi) |
Lanco |
600 |
3,548,220 |
|
Operating |
|
|
0 |
|
Chhattisgarh |
Amarkantak Power Phase II (Pathadi) unit 3 |
Lanco |
660 |
3,903,043 |
Supercritical |
Construction |
2013 |
Supercritical |
0 |
|
Chhattisgarh |
Amarkantak Power Phase II (Pathadi) unit 4 |
Lanco |
660 |
3,903,043 |
Supercritical |
Construction |
2014 |
Supercritical |
0 |
|
Chhattisgarh |
Amoda power station |
DCM Shriram Consolidated |
600 |
3,548,220 |
|
Early development |
|
|
http://bit.ly/yzr5va |
ToR issued 12-31-2009
|
Chhattisgarh |
Arasmeta Expansion Power Plant |
KSK Energy Ventures |
43 |
254,289 |
|
Construction |
|
|
0 |
|
Chhattisgarh |
Athena Chhattisgarh power station |
Athena Chhattisgarh Power Limited |
1200 |
7,096,441 |
|
Advanced development |
|
|
http://bit.ly/zzBc5r |
|
Chhattisgarh |
Avantha Bhandar power station |
Avantha Power and Infrastructure |
1200 |
7,096,441 |
|
Early development |
|
|
0 |
|
Chhattisgarh |
BALCO Korba power station expansion |
Bharat Aluminium Company |
1200 |
7,096,441 |
|
Construction |
|
|
http://bit.ly/y0Gu50, http://bit.ly/wqNo3W |
captive, delayed by accident
|
Chhattisgarh |
Balpur power station |
Jain Energy |
1200 |
7,096,441 |
|
Early development |
|
|
0 |
|
Chhattisgarh |
Baradarha power station |
DB Power |
1200 |
7,096,441 |
|
Advanced development |
|
|
0 |
|
Chhattisgarh |
Bhaiso power station (Janjgir-Champa) Phase 1 |
KVK Power & Infrastructure Pvt. Ltd. |
600 |
3,548,220 |
|
Early development |
|
|
http://bit.ly/you8Da |
|
Chhattisgarh |
Bhaiso power station (Janjgir-Champa) Phase 2 |
KVK Power & Infrastructure Pvt. Ltd. |
600 |
3,548,220 |
0 |
Proposed |
0 |
0 |
0 |
0
|
Chhattisgarh |
Bhaiyathan Thermal Power Project |
Indiabulls Power and Chhattisgarh State Power Generation Company |
1320 |
7,806,085 |
|
Early development |
2013 |
|
http://bit.ly/wDCYqj |
|
Chhattisgarh |
Bhandhakhar power station |
Maruti Clean Coal and Power |
300 |
1,774,110 |
|
Advanced development |
|
|
0 |
|
Chhattisgarh |
Bhengari power station |
Mahavir Global Coal Limited (MGCL) |
540 |
3,193,398 |
|
Proposed |
|
|
http://bit.ly/A6qGGc |
|
Chhattisgarh |
Bhushan Steel Chhattisgarh project |
Bhushan Steel |
1000 |
5,913,701 |
|
Proposed |
|
|
http://bit.ly/xbWxeF |
MOU with Chhattisgarh Govt.
|
Chhattisgarh |
Birra Thermal Power Project |
Moser Baer Power & Infrastructures |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
|
Chhattisgarh |
BLA Chhattisgarh power station |
BLA Power |
540 |
3,193,398 |
|
Cancelled |
|
|
http://bit.ly/zzBc5r |
Single mention; appears abandoned
|
Chhattisgarh |
Bunji Bundeli Thermal Power Project |
Chhattisgarh State Power Generation Company |
500 |
2,956,850 |
|
Early development |
|
|
http://bit.ly/xR8JEF (p. 5), http://bit.ly/zzBc5r |
|
Chhattisgarh |
Chakabura power station expansion |
ACB (India) |
270 |
1,596,699 |
|
Construction |
2011 |
|
http://bit.ly/y6xxny |
|
Chhattisgarh |
Champa Adhunik power station |
Adhunik Power and Natural Resources |
1320 |
7,806,085 |
|
Proposed |
|
|
0 |
|
Chhattisgarh |
Champa Power Project |
ACB (India) |
1200 |
7,096,441 |
|
Early development |
|
|
0 |
|
Chhattisgarh |
Chandan Nagar power station |
IFFCO Chhattisgarh Power |
1000 |
5,913,701 |
0 |
Proposed |
0 |
0 |
http://bit.ly/w1kCx0 |
0
|
Chhattisgarh |
Chhattisgarh GMR power station Phase I |
GMR Energy |
1370 |
8,101,770 |
|
Advanced development |
2014 |
|
0 |
|
Chhattisgarh |
Chhattisgarh GMR power station Phase II |
GMR Energy |
685 |
4,050,885 |
|
Early development |
2015 |
|
0 |
|
Chhattisgarh |
Dhardai power station |
JSW ISPAT Steel |
1200 |
7,096,441 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
|
Chhattisgarh |
Facor Power Chhattisgarh power project |
Facor Power |
600 |
3,548,220 |
Supercritical |
Early development |
|
Supercritical |
0 |
|
Chhattisgarh |
Godhna power station |
Karnataka Power Corporation |
1600 |
9,461,921 |
|
Proposed |
|
|
0 |
0
|
Chhattisgarh |
Gorra Thermal Power Plant |
Patni Power Projects |
540 |
3,193,398 |
|
Proposed |
|
|
http://bit.ly/AxNJcQ |
|
Chhattisgarh |
IFFCO-CSPGCL Thermal Power Project |
Chhattisgarh State Power Generation Company |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Chhattisgarh |
Janjgir power station |
Karnataka Power Corporation |
1200 |
7,096,441 |
|
Proposed |
2013 |
|
0 |
|
Chhattisgarh |
Kasaipalli power station |
Aryan Coal Benefications |
270 |
1,596,699 |
0 |
Proposed |
0 |
0 |
http://bit.ly/x0s1YR |
0
|
Chhattisgarh |
Khamhar power station |
AES Chhattisgarh Energy |
1440 |
8,515,729 |
|
Proposed |
|
|
http://bit.ly/ziYgeZ |
|
Chhattisgarh |
Korba III power station |
NTPC |
500 |
2,956,850 |
|
Operating |
2010 |
|
0 |
|
Chhattisgarh |
Korba South power station Unit 1 |
Chhattisgarh State Power Generation Company |
500 |
2,956,850 |
|
Early development |
2014 |
|
http://bit.ly/z7Smqz |
|
Chhattisgarh |
Korba South power station Unit 2 |
Chhattisgarh State Power Generation Company |
500 |
2,956,850 |
|
Early development |
2014 |
|
http://bit.ly/z7Smqz |
|
Chhattisgarh |
Korba West (Hasdeo Thermal Power Station) Extension |
Chhattisgarh State Power Generation Company |
500 |
2,956,850 |
|
Construction |
2012 |
|
http://bit.ly/wlSkvz |
0
|
Chhattisgarh |
KSK Mahanadi Power Project |
KSK Energy Ventures |
3600 |
21,289,323 |
|
Construction |
|
|
0 |
|
Chhattisgarh |
KSK Narmada Power Project |
KSK Energy Ventures |
1800 |
10,644,661 |
|
Early development |
|
|
0 |
|
Chhattisgarh |
Kukurda power station |
JSW Energy |
1320 |
7,806,085 |
|
Advanced development |
|
|
http://bit.ly/AtqjK9 |
0
|
Chhattisgarh |
Lanco Chhattisgarh Thermal Power Project |
Lanco |
2000 |
11,827,402 |
|
Proposed |
|
|
http://bit.ly/zzBc5r, http://bit.ly/xIkHW0 |
|
Chhattisgarh |
Lara Integrated Thermal Power Project 1-2 |
NTPC |
1600 |
9,461,921 |
Supercritical |
Advanced development |
2014 |
Supercritical |
http://bit.ly/zzBc5r |
|
Chhattisgarh |
Lara Integrated Thermal Power Project 3-4 |
NTPC |
1600 |
9,461,921 |
Supercritical |
Proposed |
2015 |
Supercritical |
http://bit.ly/zzBc5r |
|
Chhattisgarh |
Lara Integrated Thermal Power Project 5 |
NTPC |
800 |
4,730,961 |
Supercritical |
Proposed |
2016 |
Supercritical |
http://bit.ly/zzBc5r |
|
Chhattisgarh |
Marwa power station |
Chhattisgarh State Power Generation Company |
1000 |
5,913,701 |
|
Construction |
2012 |
|
http://bit.ly/wlSkvz, http://bit.ly/A2kaRF |
0
|
Chhattisgarh |
Moser Baer Captive Power Project |
Moser Baer Power & Infrastructures and PTC India |
150 |
887,055 |
|
Early development |
|
|
http://bit.ly/zHLElx |
0
|
Chhattisgarh |
Pathadi power station |
Lanco and KVK |
1320 |
7,806,085 |
|
Construction |
|
|
0 |
|
Chhattisgarh |
Raigarh Power Project (TRN/ACB) |
ACB (India) |
600 |
3,548,220 |
|
Advanced development |
2013 |
|
http://bit.ly/y6xxny |
|
Chhattisgarh |
Raigarh power station (SKS Ispat) |
SKS Ispat and Power |
1200 |
7,096,441 |
|
Early development |
|
|
http://bit.ly/zyh1gb |
Environmental clearance 10/5/10
|
Chhattisgarh |
Raigarh Project (Jindal) |
Jindal Power |
1320 |
7,806,085 |
0 |
Advanced development |
0 |
0 |
0 |
0
|
Chhattisgarh |
Raigarh project (VISA Power) |
VISA Power |
1200 |
7,096,441 |
|
Advanced development |
2013 |
|
0 |
|
Chhattisgarh |
Raikheda power station |
GMR Energy |
1370 |
8,101,770 |
Supercritical |
Construction |
2014 |
Supercritical |
http://bit.ly/yjx3A7 |
0
|
Chhattisgarh |
Raipur thermal power plant |
JSW Energy |
1320 |
7,806,085 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/wFXvf6 |
0
|
Chhattisgarh |
Ratija Power Project Phase I |
ACB (India) |
50 |
295,685 |
|
Construction |
2011 |
|
0 |
0
|
Chhattisgarh |
Ratija Power Project Phase II |
ACB (India) |
50 |
295,685 |
|
Early development |
|
|
0 |
0
|
Chhattisgarh |
Sapnai power station |
Topworth Energy |
1260 |
7,096,441 |
|
Early development |
|
|
http://bit.ly/ycqDfZ |
0
|
Chhattisgarh |
Sapos power station (BEC Power) |
BEC Power |
500 |
2,956,850 |
|
Early development |
|
|
http://bit.ly/zRPXpm |
0
|
Chhattisgarh |
Sapos power station (Suryachakra) |
Suryachakra Group |
1320 |
7,806,085 |
Ultra Supercritical |
Advanced development |
|
Ultra Supercritical |
0 |
0
|
Chhattisgarh |
Sipat I power station expansion, unit 3 |
NTPC |
660 |
3,903,043 |
0 |
Construction |
2012 |
0 |
0 |
0
|
Chhattisgarh |
Sipat I power station expansion, units 1 and 2 |
NTPC |
1320 |
7,806,085 |
|
Operating |
2011 |
|
http://bit.ly/AsI4Ed |
0
|
Chhattisgarh |
Surguja Ultra Mega Power Project |
not selected |
4000 |
23,654,803 |
|
Uncertain |
|
|
http://bit.ly/ycitg1 |
bids postponed
|
Chhattisgarh |
SV Power project (Renki) phase II |
KVK |
300 |
1,774,110 |
|
Early development |
|
|
http://bit.ly/you8Da |
0
|
Chhattisgarh |
Tamnar II Project |
Jindal Power |
2400 |
14,192,882 |
Subcritical |
Early development |
|
Subcritical |
http://bit.ly/xve0y0 |
EIA June 2009
|
Gujarat |
Akrimota power station |
Gujarat Mineral Development Corporation |
250 |
1,478,425 |
|
Unconfirmed |
|
|
0 |
0
|
Gujarat |
Amreli power station |
Avantha Power and Infrastructure |
1320 |
7,806,085 |
Supercritical |
Proposed |
2016 |
Supercritical |
http://bit.ly/zzBc5r |
0
|
Gujarat |
Bhadreshwar power station (OPG) |
OPG Power Ventures |
300 |
1,774,110 |
|
Deferred |
|
|
http://masskutch.blogspot.com/ |
0
|
Gujarat |
Bhadreshwar Thermal Power Project (Adani) |
Adani Power |
3300 |
19,515,213 |
|
Proposed |
|
|
http://bit.ly/AAcNjp |
0
|
Gujarat |
Bharuch DCM power station |
DCM Shriram Consolidated |
48 |
283,858 |
|
Proposed |
|
|
0 |
0
|
Gujarat |
Bhavnagar power station |
Gujarat Power Corporation |
375 |
2,217,638 |
|
Advanced development |
|
|
http://bit.ly/xKptRZ |
0
|
Gujarat |
Bherai power station |
VISA Power |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Gujarat |
Dahej power station (JSW Energy) |
JSW Energy |
2400 |
14,192,882 |
|
Proposed |
|
|
http://bit.ly/A1yh3a |
0
|
Gujarat |
Dahej Thermal Power Project |
Adani Power |
2640 |
15,612,170 |
|
Early development |
|
|
http://bit.ly/AAcNjp, http://bit.ly/xS8N6t |
0
|
Gujarat |
Dholera Power Plant |
Gujarat State Electricity Corp |
1600 |
9,461,921 |
|
Proposed |
2018 |
|
http://bit.ly/yg5moB |
0
|
Gujarat |
Dhuvaran Super Thermal Power Project |
NTPC |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
0
|
Gujarat |
GMR Energy coal plant |
GMR Energy |
1800 |
10,644,661 |
|
Unconfirmed |
|
|
0 |
0
|
Gujarat |
Gujarat Power Project (Valia) |
Neyveli Lignite Corporation |
500 |
2,956,850 |
|
Proposed |
|
|
http://bit.ly/z3y0at |
0
|
Gujarat |
Hazira II power plant |
Essar Energy |
270 |
1,596,699 |
|
Construction |
|
|
http://bit.ly/AnLoDj |
0
|
Gujarat |
Jamnagar Complex power station |
Reliance Industries |
1000 |
5,913,701 |
|
Proposed |
|
|
http://bit.ly/yRXsHb, http://bit.ly/wyORjb |
0
|
Gujarat |
Mundra Thermal Power Project (Adani) Phase I Unit 1 |
Adani Power |
330 |
1,951,521 |
Subcritical |
Operating |
2009 |
Subcritical |
http://bit.ly/AAcNjp |
0
|
Gujarat |
Mundra Thermal Power Project (Adani) Phase I Unit 2 |
Adani Power |
330 |
1,951,521 |
Subcritical |
Operating |
2010 |
Subcritical |
http://bit.ly/AAcNjp |
0
|
Gujarat |
Mundra Thermal Power Project (Adani) Phase II Unit 3-4 |
Adani Power |
660 |
3,903,043 |
Subcritical |
Operating |
2010 |
Subcritical |
http://bit.ly/AAcNjp |
0
|
Gujarat |
Mundra Thermal Power Project (Adani) Phase III Unit 5 |
Adani Power |
660 |
3,903,043 |
Supercritical |
Operating |
2011 |
Supercritical |
http://bit.ly/AAcNjp |
0
|
Gujarat |
Mundra Thermal Power Project (Adani) Phase III Unit 6 |
Adani Power |
660 |
3,903,043 |
0 |
Construction |
2011 |
0 |
0 |
0
|
Gujarat |
Mundra Thermal Power Project (Adani) Phase IV Unit 7 |
Adani Power |
660 |
3,903,043 |
Supercritical |
Construction |
2011 |
Supercritical |
http://bit.ly/AAcNjp |
0
|
Gujarat |
Mundra Thermal Power Project (Adani) Phase IV Unit 8-9 |
Adani Power |
660 |
3,903,043 |
Supercritical |
Construction |
2012 |
Supercritical |
http://bit.ly/AAcNjp |
0
|
Gujarat |
Okha power station |
SPR Infrastructure India |
2640 |
15,612,170 |
Supercritical |
Early development |
0 |
Supercritical |
http://bit.ly/xkPoKz |
0
|
Gujarat |
Pipavav power station |
Torrent Power and Gujarat Power Corporation |
2000 |
11,827,402 |
|
Early development |
|
|
http://bit.ly/xKptRZ, http://bit.ly/wVfALr |
Pipavav village, Amreli
|
Gujarat |
Salaya I power plant |
Essar Energy |
1200 |
7,096,441 |
|
Operating |
2012 |
|
http://bit.ly/AnLoDj, http://bit.ly/zaqVC7 |
0
|
Gujarat |
Salaya II power plant |
Essar Energy |
1200 |
7,096,441 |
|
Construction |
|
|
http://bit.ly/AnLoDj |
0
|
Gujarat |
Salaya III power plant |
Essar Energy |
600 |
3,548,220 |
|
Construction |
|
|
http://bit.ly/AnLoDj |
petcoke
|
Gujarat |
Sikka Thermal Power Station Units 3-4 |
Gujarat State Electricity Corp |
500 |
2,956,850 |
|
Construction |
2013 |
|
http://bit.ly/yg5moB |
0
|
Gujarat |
Simar power station |
JSW Energy |
1600 |
9,461,921 |
|
Cancelled |
|
|
http://bit.ly/zzBc5r, http://bit.ly/A1yh3a |
0
|
Gujarat |
Surat Lignite Ext Units 3-4 |
Gujarat Industries |
250 |
1,478,425 |
|
Operating |
2011 |
|
http://bit.ly/wM4cDa |
0
|
Gujarat |
Suryachakra captive power plant |
Suryachakra Group |
200 |
1,182,740 |
|
Early development |
|
|
0 |
0
|
Gujarat |
Tata Mundra Ultra Mega Power Project 1 |
Tata Power |
800 |
4,730,961 |
Supercritical |
Operating |
2011 |
Supercritical |
http://bit.ly/yAY9KD |
0
|
Gujarat |
Tata Mundra Ultra Mega Power Project 2-3 |
Tata Power |
1600 |
9,461,921 |
Supercritical |
Construction |
2013 |
Supercritical |
0 |
0
|
Gujarat |
Tata Mundra Ultra Mega Power Project 4-5 |
Tata Power |
1600 |
9,461,921 |
Supercritical |
Advanced development |
2014 |
Supercritical |
0 |
0
|
Gujarat |
Ukai Thermal Power Station Unit 6 |
Gujarat State Electricity Corp |
500 |
2,956,850 |
|
Construction |
2012 |
|
http://bit.ly/yg5moB |
0
|
Gujarat |
Wanakbori Thermal Power Station Unit 8 |
Gujarat State Electricity Corp |
800 |
4,730,961 |
|
Early development |
2016 |
|
http://bit.ly/yg5moB |
0
|
Haryana |
Deenbandhu Chhotu Ram Thermal Power Plant expansion |
Haryana Power Generation Company |
660 |
3,903,043 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/xnk7Ll |
0
|
Haryana |
Indira Gandhi Super Thermal Power Project Unit 3 |
NTPC |
500 |
2,956,850 |
Subcritical |
Construction |
2012 |
Subcritical |
http://bit.ly/wmQZub |
0
|
Haryana |
Indira Gandhi Super Thermal Power Project Units 1-2 |
NTPC |
1000 |
5,913,701 |
Subcritical |
Operating |
2011 |
Subcritical |
http://bit.ly/wmQZub |
0
|
Haryana |
Jhajjar power station |
CLP India |
1320 |
7,806,085 |
|
Construction |
2012 |
|
http://bit.ly/wm29gT |
0
|
Haryana |
Karchana Thermal Power Project |
Jaiprakash Power Ventures |
1980 |
11,709,128 |
Supercritical |
Construction |
2014 |
Supercritical |
http://bit.ly/zFF1C9, http://bit.ly/xgGyQx |
0
|
Haryana |
Mahatma Gandhi Thermal Power Project |
Haryana Power Generation Company |
1320 |
7,806,085 |
|
Advanced development |
2012 |
|
http://bit.ly/wmQZub |
0
|
Haryana |
Rajiv Gandhi Thermal Power Project Hisar Unit I |
Haryana Power Generation Company |
600 |
3,548,220 |
|
Operating |
2010 |
|
http://bit.ly/yXNBZq |
0
|
Haryana |
Rajiv Gandhi Thermal Power Project Hisar Unit II |
Haryana Power Generation Company |
600 |
3,548,220 |
|
Operating |
2011 |
|
http://bit.ly/yXNBZq |
0
|
Jharkhand |
Baranda power station |
JSW Energy |
1620 |
9,580,195 |
|
Early development |
|
|
http://bit.ly/wFXvf6 |
0
|
Jharkhand |
Bhagalpur power station |
Gagan Power & Natural Resources |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Jharkhand |
Bokaro A Thermal Power Station |
Damodar Valley Corporation |
600 |
3,548,220 |
|
Construction |
|
|
0 |
0
|
Jharkhand |
Bokaro Steel City Thermal Power Station |
Damodar Valley Corporation |
750 |
4,435,276 |
|
Proposed |
|
|
0 |
0
|
Jharkhand |
Chandil Singh power station |
HDIL Energy |
1320 |
7,806,085 |
Supercritical |
Unconfirmed |
|
Supercritical |
http://bit.ly/y5Qb78, http://bit.ly/zzBc5r |
not on company website
|
Jharkhand |
Chandrapura power station |
Damodar Valley Corporation |
500 |
2,956,850 |
|
Operating |
2011 |
|
0 |
0
|
Jharkhand |
Chandwa Power Project Phase I |
Abhijeet Group |
1080 |
6,386,797 |
Subcritical |
Construction |
2014 |
Subcritical |
0 |
0
|
Jharkhand |
Chandwa Power Project Phase II |
Abhijeet Group |
675 |
3,991,748 |
|
Early development |
|
|
http://bit.ly/zRw9WI |
0
|
Jharkhand |
Chandwa Power Project Phase III |
Abhijeet Group |
660 |
3,903,043 |
|
Early development |
|
|
http://bit.ly/zzBc5r |
0
|
Jharkhand |
Chichro Patsimla power station |
NTPC & Coal India |
2000 |
11,827,402 |
|
Proposed |
|
|
0 |
0
|
Jharkhand |
Dumka power station (CESC) Phase I |
CESC |
600 |
3,548,220 |
|
Early development |
2016 |
|
http://bit.ly/A2VITQ, http://bit.ly/Aj1aPB |
0
|
Jharkhand |
Dumka power station (CESC) Phase I |
CESC |
660 |
3,903,043 |
|
Proposed |
|
|
http://bit.ly/A2VITQ, http://bit.ly/Aj1aPB |
0
|
Jharkhand |
Dumka Project |
Jindal Power |
1300 |
7,687,811 |
|
Early development |
2014 |
|
0 |
0
|
Jharkhand |
Godda Project |
Jindal Power |
660 |
3,903,043 |
Supercritical |
Advanced development |
|
Supercritical |
0 |
0
|
Jharkhand |
Gumla power station (Kamdara) |
Jharkhand State Electricity Board |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/yG6umm |
0
|
Jharkhand |
Jamshedpur Kandra power station second stage |
Adhunik Power and Natural Resources |
540 |
3,193,398 |
|
Proposed |
|
|
0 |
0
|
Jharkhand |
Jamshedpur Kandra power station units 1-2 |
Adhunik Power and Natural Resources |
540 |
3,193,398 |
Subcritical |
Construction |
2012 |
Subcritical |
0 |
0
|
Jharkhand |
Jharkhand Aluminium power station |
Hindalco Industries |
900 |
5,322,331 |
|
Early development |
|
|
0 |
0
|
Jharkhand |
Jharkhand Project |
Jindal Power |
2640 |
15,612,170 |
|
Proposed |
|
|
0 |
0
|
Jharkhand |
Jojobera Power Plant unit 5 |
Tata Power |
120 |
709,644 |
|
Operating |
2011 |
|
0 |
0
|
Jharkhand |
Kamdara power station |
Jharkhand State Electricity Board |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Jharkhand |
KVK Jharkhand project |
KVK Nilachal Power Pvt. Ltd. |
1000 |
5,913,701 |
|
Early development |
|
|
http://bit.ly/you8Da |
0
|
Jharkhand |
Maithon Right Bank Thermal Power Station |
Maithon Power and Tata Power |
1050 |
6,209,386 |
|
Operating |
2011 |
|
0 |
0
|
Jharkhand |
Maithon Right Bank Thermal Power Station Phase II |
Damodar Valley Corporation |
1600 |
9,461,921 |
|
Early development |
|
|
http://bit.ly/zzBc5r |
2x800 or 3x600
|
Jharkhand |
Malaxmi Mega Thermal Power Project (Thakurbari) |
Malaxmi |
2640 |
15,612,170 |
|
Unconfirmed |
|
|
http://bit.ly/zzBc5r |
0
|
Madhya Pradesh |
Welspun Amla power station |
Welspun Energy |
1320 |
7,806,085 |
|
Early development |
|
Madhya Pradesh |
Welspun Energy Anuppur Thermal Power Plant |
Welspun Energy |
1980 |
11,709,128 |
|
Early development |
|
Jharkhand |
Welspun Energy Parbahal Themal Power Plant |
Welspun Energy |
1980 |
11,709,128 |
|
early development |
|
Jharkhand |
Patratu power station |
Jinbhuvish Energy (East) |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/ziU5VR |
0
|
Jharkhand |
Rahem power station |
Gupta Energy |
1000 |
5,913,701 |
|
Unconfirmed |
|
|
http://bit.ly/wXdcGe, http://bit.ly/zzBc5r |
0
|
Jharkhand |
Ranchi Thermal Power Project |
VISA Power |
2640 |
15,612,170 |
|
Early development |
|
|
http://bit.ly/xJMad9, http://bit.ly/zzBc5r |
coal in doubt, Seraikela village
|
Jharkhand |
Sahibganj power station |
Madhucon Projects |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/zLaVJU |
ToR issued 3-30-2011
|
Jharkhand |
Saraikela power station |
Kohinoor Power |
215 |
1,271,446 |
|
Construction |
|
|
http://bit.ly/wIbxVG |
0
|
Jharkhand |
Tilaiya Ultra Mega Power Project 1-5 |
Reliance Power |
3300 |
19,515,213 |
Supercritical |
Early development |
2015 |
Supercritical |
0 |
0
|
Jharkhand |
Tilaiya Ultra Mega Power Project 6 |
Reliance Power |
660 |
3,903,043 |
Supercritical |
Early development |
2017 |
Supercritical |
0 |
0
|
Jharkhand |
Tiruldih Power Project |
Tata Power |
1980 |
11,709,128 |
|
Early development |
|
|
0 |
0
|
Jharkhand |
Tori I power plant |
Essar Energy |
1200 |
7,096,441 |
|
Construction |
|
|
http://bit.ly/AnLoDj |
0
|
Jharkhand |
Tori II power plant |
Essar Energy |
600 |
3,548,220 |
|
Construction |
|
|
http://bit.ly/AnLoDj |
0
|
Karnataka |
Bellary OPG power station |
OPG Power Ventures |
12 |
70,964 |
|
Construction |
|
|
0 |
0
|
Karnataka |
Bellary Thermal Power Station 2 |
Karnataka Power Corporation |
500 |
2,956,850 |
|
Construction |
2012 |
|
http://bit.ly/xRaOpf |
0
|
Karnataka |
Bellary Thermal Power Station 3 |
Karnataka Power Corporation |
700 |
4,139,591 |
|
Proposed |
2014 |
|
0 |
0
|
Karnataka |
Chamalapura power station |
Karnataka Power Corporation |
1000 |
5,913,701 |
|
Cancelled |
|
|
0 |
0
|
Karnataka |
Edlapura power station |
Karnataka Power Corporation |
800 |
4,730,961 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/xVtdyu |
0
|
Karnataka |
Ghataprabha power station |
Power Company of Karnataka (PCKL) |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/wfiT61, http://bit.ly/wp6ouM |
0
|
Karnataka |
Godhna power station |
Karnataka Power Corporation |
1600 |
9,461,921 |
|
Proposed |
|
|
http://bit.ly/wa0wTC |
0
|
Karnataka |
Gulbarga power station |
Power Company of Karnataka (PCKL) |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/wp6ouM |
0
|
Karnataka |
Hanakon Thermal Power Project |
Ind-Barath Power |
450 |
2,661,165 |
|
Cancelled |
|
|
0 |
0
|
Karnataka |
Hassan power station |
Hassan Thermal Power (P) Ltd |
1000 |
5,913,701 |
|
Early development |
|
|
http://bit.ly/AhHQAK |
ToR issued 11/5/09
|
Karnataka |
Jewargi power station |
Jewargi Power Pvt Ltd. |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/wVEKfX |
0
|
Karnataka |
JSW Vijayanagar power station expansion |
JSW Energy |
660 |
3,903,043 |
Supercritical |
Early development |
|
Supercritical |
0 |
0
|
Karnataka |
Kadechur power station |
Atlas Power India |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/zzBc5r |
protests: http://bit.ly/yQtD9d
|
Karnataka |
Karnataka Gupta power station |
Gupta Power |
1320 |
7,806,085 |
|
Unconfirmed |
|
|
0 |
0
|
Karnataka |
Kudgi Super Thermal Power Project Stage I |
NTPC |
2400 |
14,192,882 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/wp6ouM, http://bit.ly/zQIzFt, http://bit.ly/woeTKd, http://bit.ly/y1TV0c |
0
|
Karnataka |
Kudgi Super Thermal Power Project Stage II |
NTPC |
1600 |
9,461,921 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/wp6ouM, http://bit.ly/zQIzFt, http://bit.ly/woeTKd |
0
|
Karnataka |
Mangoli power station |
Flamingo Energy Ventures |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/yqpsCJ |
ToR issued 4/27/11
|
Karnataka |
Mulwad power station |
Luxor Energy |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/An4rvO |
0
|
Karnataka |
Raichur Thermal Power Station expansion |
Karnataka Power Corporation |
250 |
1,478,425 |
Subcritical |
Operating |
2010 |
Subcritical |
http://bit.ly/zMfivF |
0
|
Karnataka |
Udupi Power Phase I |
Lanco |
600 |
3,548,220 |
Subcritical |
Operating |
2010 |
Subcritical |
http://bit.ly/vZLH9a |
0
|
Karnataka |
Udupi Power Phase II |
Lanco |
600 |
3,548,220 |
Subcritical |
Operating |
2011 |
Subcritical |
http://bit.ly/vZLH9a |
0
|
Karnataka |
Vadlur power station |
Surana Power Ltd |
420 |
2,483,754 |
|
Advanced development |
2013 |
|
http://bit.ly/xxeSQI |
0
|
Karnataka |
Vantamuri power station |
Shree Renuka Energy |
1050 |
6,209,386 |
|
Early development |
|
|
http://bit.ly/xgp2YQ |
ToR issued 8/11/10
|
Karnataka |
Yeramarus thermal station |
Karnataka Power Corporation |
1700 |
10,053,291 |
Supercritical |
Construction |
2014 |
Supercritical |
http://bit.ly/A0uDmU |
0
|
Kerala |
Kasargod power station |
Kerala State Industrial Development Corp. |
2400 |
14,192,882 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/wi8mno |
0
|
Madhya Pradesh |
Annupur power station (Newzone) |
New Zone India |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/yCiZ3B |
ToR issued 10/12/10
|
Madhya Pradesh |
Anuppor Thermal Power Project Phase 1 |
Moser Baer Power & Infrastructures |
1200 |
7,096,441 |
|
Construction |
|
|
0 |
0
|
Madhya Pradesh |
Anuppor Thermal Power Project Phase 2 |
Moser Baer Power & Infrastructures |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Madhya Pradesh |
Banas Thermal Power project (Anuppur) |
KVK Power & Infrastructure Pvt. Ltd. |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/you8Da |
0
|
Madhya Pradesh |
Bansagar power station |
MPTradco |
1600 |
9,461,921 |
Supercritical |
Early development |
2015 |
Supercritical |
http://bit.ly/x29EoA |
0
|
Madhya Pradesh |
Barahi power station |
Sudama Mahavir Power |
1320 |
7,806,085 |
Supercritical |
Proposed |
2015 |
Supercritical |
0 |
0
|
Madhya Pradesh |
Barethi Super Thermal Power Project |
NTPC |
3960 |
23,418,255 |
|
Early development |
|
|
http://bit.ly/zLlIMO |
0
|
Madhya Pradesh |
Bina Refinery power station |
Bharat Oman Refinery |
99 |
585,456 |
|
Construction |
|
|
0 |
0
|
Madhya Pradesh |
Bina Thermal Power Project |
Jaiprakash Power Ventures |
1250 |
7,392,126 |
|
Construction |
2012 |
|
http://bit.ly/zFF1C9 |
0
|
Madhya Pradesh |
Champa-Janjgir power station Unit 1 |
ACB (India) |
600 |
3,548,220 |
|
Proposed |
2015 |
|
0 |
0
|
Madhya Pradesh |
Champa-Janjgir power station Unit 2 |
ACB (India) |
600 |
3,548,220 |
|
Proposed |
2016 |
|
0 |
0
|
Madhya Pradesh |
Chhindwara JSW power station |
JSW Energy |
1320 |
7,806,085 |
|
Cancelled |
|
|
0 |
0
|
Madhya Pradesh |
Chitrangi power station |
Reliance Power |
3960 |
23,418,255 |
Supercritical |
Construction |
|
Supercritical |
0 |
0
|
Madhya Pradesh |
Dada Dhuniwale Thermal Power Project |
M.P. Power Generating Company |
1600 |
9,461,921 |
|
Proposed |
|
|
http://bit.ly/wn852A |
0
|
Madhya Pradesh |
Gadarwara power station (BLA) |
BLA Power |
140 |
827,918 |
Subcritical |
Advanced development |
|
Subcritical |
http://bit.ly/w56w6Y, http://bit.ly/z6h6lj |
Soliciting bids; also listed as 320 MW
|
Madhya Pradesh |
Gadarwara Super Thermal Power Project |
NTPC |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/x1QKCr |
0
|
Madhya Pradesh |
Jabalpur Thermal Power Project |
VISA Power |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Madhya Pradesh |
Jaypee Nigrie Super Thermal Power Project |
Jaiprakash Power Ventures |
1320 |
7,806,085 |
Supercritical |
Construction |
2013 |
Supercritical |
http://bit.ly/zFF1C9 |
0
|
Madhya Pradesh |
Jhabua (Chetak) power station |
Chetak Enterprises |
1320 |
7,806,085 |
|
Deferred |
|
|
http://bit.ly/x3E1bn |
CIL refused coal linkage
|
Madhya Pradesh |
Jhabua Power Seoni power station phase 1 |
Avantha Power and Infrastructure |
600 |
3,548,220 |
Subcritical |
Construction |
|
Subcritical |
0 |
0
|
Madhya Pradesh |
Jhabua Power Seoni power station phase 2 |
Avantha Power and Infrastructure |
660 |
3,903,043 |
Supercritical |
Advanced development |
|
Supercritical |
0 |
0
|
Madhya Pradesh |
Katni power station |
Welspun Energy |
1980 |
11,709,128 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/wVDLhK |
0
|
Madhya Pradesh |
Khargaone power station |
NTPC |
0 |
0 |
|
Proposed |
|
|
http://bit.ly/zLlIMO |
0
|
Madhya Pradesh |
Madhya Pradesh Jain Energy power station (Birhulee) |
Jain Energy |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/xUa8Zi, http://bit.ly/zzBc5r |
MOU with MP state
|
Madhya Pradesh |
Mahan Aluminium power station |
Hindalco Industries |
900 |
5,322,331 |
|
Construction |
|
|
0 |
0
|
Madhya Pradesh |
Mahan I power plant |
Essar Energy |
1200 |
7,096,441 |
|
Construction |
2012 |
|
http://bit.ly/AnLoDj, http://bit.ly/zaqVC7 |
0
|
Madhya Pradesh |
Mahan II power plant |
Essar Energy |
600 |
3,548,220 |
|
Proposed |
|
|
http://bit.ly/yQlTAA |
0
|
Madhya Pradesh |
Maharjapur power station |
Sudama Mahavir Power |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Madhya Pradesh |
Mandsaur power station |
Chetak Enterprises |
1320 |
7,806,085 |
|
Deferred |
|
|
http://bit.ly/x3E1bn |
CIL refused coal linkage
|
Madhya Pradesh |
Pench Thermal Power Project |
Adani Power |
1320 |
7,806,085 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/AAcNjp |
0
|
Madhya Pradesh |
Sasan Ultra Mega Power Project 1-2 |
Reliance Power |
1320 |
7,806,085 |
|
Construction |
2013 |
|
0 |
0
|
Madhya Pradesh |
Sasan Ultra Mega Power Project 3 |
Reliance Power |
660 |
3,903,043 |
|
Construction |
2014 |
|
0 |
0
|
Madhya Pradesh |
Sasan Ultra Mega Power Project 4-5 |
Reliance Power |
1320 |
7,806,085 |
|
Construction |
2015 |
|
0 |
0
|
Madhya Pradesh |
Sasan Ultra Mega Power Project 6 |
Reliance Power |
660 |
3,903,043 |
|
Construction |
2016 |
|
0 |
0
|
Madhya Pradesh |
Satpura Thermal Power Station Units 10-11 |
M.P. Power Generating Company |
500 |
2,956,850 |
|
Construction |
2012 |
|
http://bit.ly/xd4dSE |
0
|
Madhya Pradesh |
Shahdol power station (formerly SJK Powergen) |
GMR Energy |
1370 |
8,101,770 |
|
Early development |
2014 |
|
http://bit.ly/wAjTul |
Was SJK Powergen project
|
Madhya Pradesh |
Shahpura power station |
MP Power Trading Company Limited |
1500 |
8,870,551 |
|
Early development |
|
|
http://bit.ly/ztKo1u |
0
|
Madhya Pradesh |
Shree Singaji Thermal Power Project Stage I Unit 1 |
M.P. Power Generating Company |
600 |
3,548,220 |
|
Construction |
2012 |
|
http://bit.ly/wBI0UI |
0
|
Madhya Pradesh |
Shree Singaji Thermal Power Project Stage I Unit 2 |
M.P. Power Generating Company |
600 |
3,548,220 |
|
Construction |
2013 |
|
http://bit.ly/wBI0UI |
0
|
Madhya Pradesh |
Shree Singaji Thermal Power Project Stage II |
M.P. Power Generating Company |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/zj9chb |
0
|
Madhya Pradesh |
Sidhi Power Project |
ACB (India) |
1200 |
7,096,441 |
|
Advanced development |
2014 |
|
http://bit.ly/y6xxny, http://bit.ly/x7tnV8 |
0
|
Madhya Pradesh |
Suryachakra Thermal (Madhya Pradesh) |
Suryachakra Group |
1320 |
7,806,085 |
Supercritical |
Deferred |
|
Supercritical |
0 |
0
|
Madhya Pradesh |
Vindhyachal-IV power station |
NTPC |
1000 |
5,913,701 |
|
Construction |
|
|
0 |
0
|
Madhya Pradesh |
Vindhyachal-V power station |
NTPC |
500 |
2,956,850 |
|
Proposed |
|
|
0 |
0
|
Madhya Pradesh |
Welspun Mega Industrial & Energy Park |
Welspun Energy Park Pvt. Ltd. |
5280 |
31,224,340 |
|
Early development |
|
|
http://bit.ly/w2F5C0, http://bit.ly/zzBc5r |
0
|
Maharashtra |
Amravati Thermal Power Project Phase I |
Indiabulls Power |
1350 |
7,983,496 |
|
Construction |
|
|
http://bit.ly/xDiZZt |
0
|
Maharashtra |
Amravati Thermal Power Project Phase II |
Indiabulls Power |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/xDiZZt |
0
|
Maharashtra |
Bela power station |
Ideal Energy Projects |
270 |
1,596,699 |
|
Construction |
|
|
0 |
0
|
Maharashtra |
Bela power station (Mantri Power) |
Mantri Power |
540 |
3,193,398 |
|
Unconfirmed |
|
|
0 |
0
|
Maharashtra |
Bhadravati power station (Ispat) |
JSW ISPAT Steel |
2000 |
11,827,402 |
|
Proposed |
|
|
http://bit.ly/yb8HwZ |
0
|
Maharashtra |
Bhadravati power station (MIDC) |
Maharashtra Industrial Development Corporation |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/AsTpdc, http://bit.ly/zha6Qu |
0
|
Maharashtra |
Bhandewadi power station |
Nagpur Municipal Corporation |
500 |
2,956,850 |
|
Deferred |
|
|
0 |
0
|
Maharashtra |
Bhusawal Thermal Power Station Unit 6 |
Maharashtra State Power Generation Company |
660 |
3,903,043 |
|
Advanced development |
|
|
0 |
0
|
Maharashtra |
Bhusawal Thermal Power Station Units 4-5 |
Maharashtra State Power Generation Company |
1000 |
5,913,701 |
|
Operating |
2011 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Bijora power station |
Jinbhuvish Power Generations |
1260 |
7,451,263 |
Subcritical |
Advanced development |
|
Subcritical |
http://bit.ly/ziU5VR |
0
|
Maharashtra |
Butibori power station |
Reliance Power |
600 |
3,548,220 |
|
Construction |
2012 |
|
http://bit.ly/y3bqxW |
0
|
Maharashtra |
Chandrapur CESC power station (Tadali) |
CESC |
600 |
3,548,220 |
|
Construction |
2013 |
|
http://bit.ly/AAhjix |
0
|
Maharashtra |
Chandrapur Gupta power station stage 2 |
Gupta Energy |
540 |
3,193,398 |
|
Advanced development |
|
|
0 |
0
|
Maharashtra |
Chandrapur Gupta power station stage I |
Gupta Energy |
120 |
709,644 |
|
Construction |
|
|
0 |
0
|
Maharashtra |
Chandrapur Thermal Power Station unit 8 |
Maharashtra State Power Generation Company |
500 |
2,956,850 |
|
Construction |
2012 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Chandrapur Thermal Power Station unit 9 |
Maharashtra State Power Generation Company |
500 |
2,956,850 |
|
Construction |
2013 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Coastal Maharashtra Project Phase I |
Tata Power |
1600 |
9,461,921 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/yKXemO |
0
|
Maharashtra |
Coastal Maharashtra Project Phase II |
Tata Power |
800 |
4,730,961 |
0 |
Proposed |
0 |
0 |
0 |
0
|
Maharashtra |
Dahanu power station upgrade |
Reliance Infrastructure Limited |
1200 |
7,096,441 |
|
Uncertain |
|
|
http://bit.ly/wD2gDs; http://bit.ly/yS2yaA |
0
|
Maharashtra |
Devgad UMPP |
NTPC |
4000 |
23,654,803 |
|
Uncertain |
|
|
0 |
0
|
Maharashtra |
Dhakore power station |
Ind-Barath Power |
1050 |
6,209,386 |
|
Unconfirmed |
|
|
http://bit.ly/AtMAxN |
0
|
Maharashtra |
Dhariwal power station |
Haldia Energy |
600 |
3,548,220 |
|
Advanced development |
|
|
0 |
0
|
Maharashtra |
Dhopave coal plant (NTPC) |
NTPC |
1600 |
9,461,921 |
|
Proposed |
|
|
0 |
0
|
Maharashtra |
Dhopave Thermal Power Station (Mahagenco) Unit 1-3 |
Maharashtra State Power Generation Company |
1980 |
11,709,128 |
Supercritical |
Advanced development |
0 |
Supercritical |
http://bit.ly/ygdren |
0
|
Maharashtra |
Dhopave Thermal Power Station (Mahagenco) Unit 4 |
Maharashtra State Power Generation Company |
800 |
4,730,961 |
Supercritical |
Cancelled |
0 |
Supercritical |
http://bit.ly/ygdren |
0
|
Maharashtra |
Dondaicha Thermal Power Station Stage I (Units 1 and 2) |
Maharashtra State Power Generation Company |
1320 |
7,806,085 |
|
Advanced development |
2016 |
|
http://bit.ly/ygdren, http://bit.ly/ytWb1N |
0
|
Maharashtra |
Dondaicha Thermal Power Station Stage II (Unit 3-5) |
Maharashtra State Power Generation Company |
1980 |
11,709,128 |
|
Proposed |
2017 |
|
http://bit.ly/ygdren, http://bit.ly/ytWb1N |
0
|
Maharashtra |
EMCO Energy Warora Power Project |
EMCO Energy |
600 |
3,548,220 |
|
Construction |
2012 |
|
http://bit.ly/wKHggU |
0
|
Maharashtra |
Ghugus power station phase I |
Gupta Coalfields & Washeries |
120 |
709,644 |
|
Advanced development |
|
|
http://bit.ly/A0C3kn |
0
|
Maharashtra |
Ghugus power station phase II |
Gupta Coalfields & Washeries |
540 |
3,193,398 |
0 |
Proposed |
0 |
0 |
0 |
0
|
Maharashtra |
Girye Ultra Mega Power Project |
not yet determined |
4000 |
23,654,803 |
|
Deferred |
|
|
0 |
0
|
Maharashtra |
GMR Energy coal plant |
GMR Energy |
1800 |
10,644,661 |
|
Unconfirmed |
|
|
0 |
Not on company website
|
Maharashtra |
Khaperkheda TPS Unit 5 |
Maharashtra State Power Generation Company |
500 |
2,956,850 |
|
Operating |
2011 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Khursapar power station |
Lenexis Energy |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/xAhOSW |
0
|
Maharashtra |
Khutafali (Kolura) power station |
Jinbhuvish Power Generations |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/ziU5VR |
0
|
Maharashtra |
Kinebodi power station |
Nandlal Enterprises |
750 |
4,435,276 |
|
Early development |
|
|
http://bit.ly/ADTPoK |
sulfur control
|
Maharashtra |
Koradi Thermal Power Station 10 |
Maharashtra State Power Generation Company |
660 |
3,903,043 |
|
Construction |
2014 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Koradi Thermal Power Station 8 |
Maharashtra State Power Generation Company |
660 |
3,903,043 |
|
Construction |
2013 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Koradi Thermal Power Station 9 |
Maharashtra State Power Generation Company |
660 |
3,903,043 |
|
Construction |
2014 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Lanco Vidarbha Thermal Power |
Lanco |
1320 |
7,806,085 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/y87jtJ |
0
|
Maharashtra |
Latur power station |
Maharashtra State Power Generation Company |
1320 |
7,806,085 |
Supercritical |
Proposed |
2016 |
Supercritical |
http://bit.ly/ygdren, http://bit.ly/ytWb1N |
0
|
Maharashtra |
Madhekar power station |
Patni Energy |
405 |
2,395,049 |
CFB |
Unconfirmed |
0 |
CFB |
http://bit.ly/wHUl9s |
0
|
Maharashtra |
Mauda-I STPP (Nagpur) |
NTPC |
1000 |
5,913,701 |
|
Construction |
2012 |
|
http://bit.ly/yofM4N, http://bit.ly/zqNOMZ |
Delayed
|
Maharashtra |
Mauda-II STPP (Nagpur) |
NTPC |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/yofM4N, http://bit.ly/wlyKop |
0
|
Maharashtra |
Mendki thermal power project |
Maharashtra State Power Generation Company |
1320 |
7,806,085 |
|
Proposed |
|
|
0 |
0
|
Maharashtra |
Nardana power station (Vaghode) |
Shirpur Power |
300 |
1,774,110 |
|
Advanced development |
|
|
http://bit.ly/x7QMMN |
0
|
Maharashtra |
Nasik Thermal Power Project |
Indiabulls Power |
1350 |
7,983,496 |
|
Early development |
|
|
0 |
0
|
Maharashtra |
Nasik Thermal Power Station (Sinnar) expansion |
Maharashtra State Power Generation Company |
1320 |
7,806,085 |
Supercritical |
Early development |
2017 |
Supercritical |
http://bit.ly/vZqfZW |
0
|
Maharashtra |
Paras power station extension |
Maharashtra State Power Generation Company |
660 |
3,903,043 |
|
Proposed |
0 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Paras power station unit 4 |
Maharashtra State Power Generation Company |
250 |
1,478,425 |
|
Operating |
2010 |
|
http://bit.ly/ygdren |
0
|
Maharashtra |
Parli Thermal Power Station |
Maharashtra State Power Generation Company |
250 |
1,478,425 |
Subcritical |
Operating |
2010 |
Subcritical |
http://bit.ly/ygdren |
0
|
Maharashtra |
Rampur coal plant |
Finolex |
1000 |
5,913,701 |
|
Proposed |
|
|
0 |
0
|
Maharashtra |
Ratnagiri Power Plant |
JSW Energy |
1200 |
7,096,441 |
|
Operating |
2011 |
|
http://bit.ly/AmaS8K |
0
|
Maharashtra |
Ratnagiri Power Plant expansion |
JSW Energy |
3200 |
18,923,843 |
Supercritical |
Deferred |
|
Supercritical |
http://bit.ly/AmaS8K |
0
|
Maharashtra |
Shahpur Thermal Power Project |
Reliance Power |
1200 |
7,096,441 |
|
Cancelled |
|
|
0 |
0
|
Maharashtra |
Solapur power station |
NTPC |
1320 |
7,806,085 |
Supercritical |
Advanced development |
2013 |
Supercritical |
http://bit.ly/AzVAs1, http://bit.ly/yofM4N |
0
|
Maharashtra |
Tiroda Thermal Power Project Phase I and II |
Adani Power |
1980 |
11,709,128 |
Supercritical |
Construction |
2012 |
Supercritical |
http://bit.ly/AAcNjp, http://bit.ly/z4eoSe |
0
|
Maharashtra |
Tiroda Thermal Power Project Phase III |
Adani Power |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/z4eoSe |
0
|
Maharashtra |
Veshvi power station |
Hari Hareshwar Power Company (Etsinta Energy) |
1600 |
9,461,921 |
0 |
Proposed |
0 |
0 |
http://bit.ly/yz3iei |
0
|
Maharashtra |
Waral power station |
Ind-Barath Power |
450 |
2,661,165 |
|
Cancelled |
|
|
http://bit.ly/xNByr3 |
0
|
Maharashtra |
Wardha Warora Power Plant Unit 1 |
KSK Energy Ventures |
135 |
798,350 |
|
Operating |
2010 |
|
http://bit.ly/xjsVt1 |
0
|
Maharashtra |
Wardha Warora Power Plant Units 2-4 |
KSK Energy Ventures |
405 |
2,395,049 |
|
Operating |
2011 |
|
0 |
0
|
Maharashtra |
Welspun Maxsteel power station |
Welspun Energy |
330 |
1,951,521 |
|
Early development |
|
Meghalaya |
Garo Hills power station |
NEEPCO |
500 |
2,956,850 |
|
Early development |
|
|
http://bit.ly/xA5gAF |
|
Meghalaya |
West Khasi Hills power station |
NEEPCO |
240 |
1,419,288 |
|
Proposed |
|
|
http://bit.ly/xr7tH1 |
|
Orissa |
Aditya Aluminium power station |
Hindalco Industries |
900 |
5,322,331 |
|
Construction |
|
|
0 |
0
|
Orissa |
Angul I power station (Derang) Unit 1 |
Jindal India Thermal Power |
600 |
3,548,220 |
|
Construction |
2012 |
|
http://bit.ly/zw67T4 |
0
|
Orissa |
Angul I power station (Derang) Unit 2 |
Jindal India Thermal Power |
600 |
3,548,220 |
|
Construction |
2013 |
|
http://bit.ly/zw67T4 |
0
|
Orissa |
Angul I power station (Derang) Unit 3 |
Jindal India Thermal Power |
600 |
3,548,220 |
|
Construction |
|
|
0 |
0
|
Orissa |
Angul II power station (Derang) |
Jindal India Thermal Power |
1320 |
7,806,085 |
|
Construction |
|
|
0 |
0
|
Orissa |
Angul Smelter power station |
National Aluminium Company |
360 |
2,128,932 |
|
Operating |
|
|
0 |
new units 2009-2011
|
Orissa |
Angul Steel power station |
Jindal Steel & Power |
810 |
4,790,098 |
|
Construction |
2012 |
|
0 |
0
|
Orissa |
Babandh power station |
Lanco |
1320 |
7,806,085 |
Supercritical |
Advanced development |
|
Supercritical |
0 |
0
|
Orissa |
Balangir power station |
Sahara India Power Corporation |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Orissa |
Baragaon power station |
Jinbhuvish Power Generations |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/ziU5VR |
0
|
Orissa |
Basundhara power station |
Mahanadi Coalfields Limited |
1600 |
9,461,921 |
Supercritical |
Early development |
|
Supercritical |
http://bit.ly/wq3W86 |
0
|
Orissa |
Bhubaneshwar Jasper power station |
Bhubaneshwar Power |
135 |
798,350 |
|
Proposed |
|
|
0 |
0
|
Orissa |
Brahmani power project |
NTPC & Coal India |
2000 |
11,827,402 |
|
Proposed |
|
|
0 |
0
|
Orissa |
Choudwar power station |
Indian Metals & Ferro |
150 |
887,055 |
|
Construction |
|
|
0 |
0
|
Orissa |
Cuttack power station |
VISA Power |
1320 |
7,806,085 |
Supercritical |
Proposed |
|
Supercritical |
0 |
0
|
Orissa |
Cuttack power station (KVK Nilachal) Phase I |
KVK |
350 |
2,069,795 |
|
Construction |
2012 |
|
http://bit.ly/wokz9o |
0
|
Orissa |
Cuttack power station (KVK Nilachal) Phase II |
KVK |
700 |
4,139,591 |
|
Proposed |
|
|
http://bit.ly/wokz9o |
0
|
Orissa |
Darlipali Super Thermal Power Station |
NTPC |
1600 |
9,461,921 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/yNwskJ |
0
|
Orissa |
Dhenkanal power station |
CESC |
1000 |
5,913,701 |
0 |
Proposed |
0 |
0 |
0 |
0
|
Orissa |
Gajmara Super Thermal Power Station |
NTPC |
1600 |
9,461,921 |
|
Advanced development |
|
|
MOC7-31-11, http://bit.ly/wG47vD |
Sizes reports vary
|
Orissa |
Ganjam power station |
SPR Infrastructure India |
2640 |
15,612,170 |
Supercritical |
Early development |
0 |
Supercritical |
http://bit.ly/xkPoKz |
0
|
Orissa |
Ghogarpalli Ultra Mega Power Project |
Power Finance Corporation |
4000 |
23,654,803 |
|
Proposed |
|
|
0 |
Ghogarpalli Integrated Power Company
|
Orissa |
IB Thermal Power Station Phase I |
Orissa Power Generation Corporation |
1320 |
7,806,085 |
|
Advanced development |
|
|
MOC7-31-11 |
0
|
Orissa |
Jharsuguda CPP power station Units 8 & 9 |
Vedanta Resources |
270 |
1,596,699 |
|
Operating |
2011 |
|
0 |
0
|
Orissa |
Jharsuguda Ind-Barath power station Phase I |
Ind-Barath Power |
700 |
4,139,591 |
|
Advanced development |
|
|
http://bit.ly/xNByr3 |
0
|
Orissa |
Jharsuguda Ind-Barath power station Phase II |
Ind-Barath Power |
660 |
3,903,043 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/xNByr3 |
0
|
Orissa |
Jharsuguda Sterlite power station Unit 1 |
Sterlite Energy |
600 |
3,548,220 |
Subcritical |
Operating |
2010 |
Subcritical |
http://bit.ly/xcbJSq |
0
|
Orissa |
Jharsuguda Sterlite power station Unit 4 |
Sterlite Energy |
600 |
3,548,220 |
0 |
Construction |
2012 |
0 |
0 |
0
|
Orissa |
Jharsuguda Sterlite power station Units 2 and 3 |
Sterlite Energy |
1200 |
7,096,441 |
Subcritical |
Operating |
2011 |
Subcritical |
http://bit.ly/xcbJSq |
0
|
Orissa |
JR Power Project |
KSK Energy Ventures |
1980 |
11,709,128 |
|
Proposed |
|
|
0 |
0
|
Orissa |
Kamalanga power station phase I |
GMR Energy |
1050 |
6,209,386 |
|
Construction |
2012 |
|
http://bit.ly/wAjTul, http://bit.ly/xnSqN3 |
0
|
Orissa |
Kamalanga power station phase II |
GMR Energy |
350 |
2,069,795 |
0 |
Advanced development |
0 |
0 |
0 |
0
|
Orissa |
Kishore Nagar Coal-to-Liquids Project |
Jindal Steel & Power |
1350 |
7,983,496 |
|
Proposed |
|
|
0 |
0
|
Orissa |
Malibrahmani power station |
Monnet Power Company |
1005 |
5,943,269 |
Subcritical |
Construction |
|
Subcritical |
http://bit.ly/AwnE1h |
0
|
Orissa |
Naraj Marthapur power project |
Tata Power |
660 |
3,903,043 |
|
Proposed |
|
|
0 |
0
|
Orissa |
Navabharat II power station |
Essar Energy |
1200 |
7,096,441 |
|
Proposed |
|
|
0 |
0
|
Orissa |
Navabharat power station |
Essar Energy |
1050 |
6,209,386 |
|
Construction |
2014 |
|
http://bit.ly/AnLoDj |
0
|
Orissa |
Neulapoi power station (Dhenkanal) |
CESC |
1200 |
7,096,441 |
|
Early development |
2015 |
|
http://bit.ly/yPef7d, http://bit.ly/wtV6Ob |
previously 1000 MW - see MOC7-31-11
|
Orissa |
Paradip power plant |
Essar Energy |
120 |
709,644 |
|
Construction |
|
|
http://bit.ly/AnLoDj |
0
|
Orissa |
Pitamohul power station |
Ind-Barath Power |
1320 |
7,806,085 |
0 |
Proposed |
0 |
0 |
http://bit.ly/xa6MGe |
0
|
Orissa |
Randia power station |
Facor Power |
100 |
591,370 |
|
Construction |
|
|
0 |
0
|
Orissa |
Rengali power station |
Neyveli Lignite Corporation |
2000 |
11,827,402 |
|
Proposed |
|
|
http://bit.ly/xOBQ40 |
0
|
Orissa |
Sri Ramchandrapur power project |
Dr. RKP Power |
120 |
709,644 |
|
Proposed |
|
|
0 |
0
|
Orissa |
Srirampur Coal-to-Liquids Project |
Strategic Energy Technology Systems |
0 |
0 |
|
Proposed |
|
|
0 |
80,000 barrels/day coal-to-liquids
|
Orissa |
Sundargarh Ultra Mega Power Project (Lankahuda) |
NTPC |
4000 |
23,654,803 |
|
Proposed |
|
|
0 |
0
|
Orissa |
Talabira thermal station |
Neyveli Lignite Corporation, Mahanadi Coal Fields |
2000 |
11,827,402 |
|
Cancelled |
|
|
http://bit.ly/xOBQ40 |
0
|
Orissa |
Talcher Super Thermal Power Station expansion |
NTPC |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/wDtBAW |
0
|
Orissa |
Talcher Thermal Power Station expansion |
NTPC |
500 |
2,956,850 |
|
Proposed |
|
|
MOC7-31-11, http://bit.ly/wDtBAW |
not included on NTPC list here: http://bit.ly/AsI4Ed
|
Orissa |
Wardha Naini Power Project |
KSK Energy Ventures |
1800 |
10,644,661 |
|
Proposed |
|
|
0 |
0
|
Punjab |
GHTP Lehra Mohabbat Stage III |
Punjab State Electric Board |
1000 |
5,913,701 |
|
Operating |
|
|
http://bit.ly/zgo89o |
0
|
Punjab |
Gidderbaha power station |
Punjab State Electric Board |
2640 |
15,612,170 |
|
Uncertain |
|
|
http://bit.ly/wncR06, http://bit.ly/xGP460 |
0
|
Punjab |
GNDTP Bathinda Extn. Stage-II |
Punjab State Electric Board |
500 |
2,956,850 |
|
Proposed |
|
|
MOC7-31-11 (old plant being renovated: http://bit.ly/wiL7wC) |
0
|
Punjab |
Gobindpura power station |
Indiabulls Power |
1320 |
7,806,085 |
0 |
Proposed |
0 |
0 |
0 |
0
|
Punjab |
Goindwal Sahib Thermal Power Plant |
GVK |
600 |
3,548,220 |
|
Construction |
|
|
http://bit.ly/wH4jlJ |
0
|
Punjab |
Goindwal Sahib Thermal Power Plant expansion |
GVK |
1320 |
7,806,085 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/wH4jlJ |
0
|
Punjab |
Mukerian power station |
Punjab State Power Corporation |
1320 |
7,806,085 |
|
Early development |
|
|
http://bit.ly/zalIaQ |
0
|
Punjab |
Rajpura Thermal Power Project (Nalash) |
Punjab State Power Corporation |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/wPk9wW |
site changed from Nabha
|
Punjab |
Ropar thermal plant expansion |
Punjab State Electric Board |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/zReqKs, http://bit.ly/yGO5to |
0
|
Punjab |
Talwandi Sabo Power Project Unit 4 |
Sterlite Energy |
660 |
3,903,043 |
Supercritical |
Cancelled |
|
Supercritical |
http://bit.ly/zALMqG |
0
|
Punjab |
Talwandi Sabo Power Project Units 1-3 |
Sterlite Energy |
1980 |
11,709,128 |
Supercritical |
Construction |
|
Supercritical |
http://bit.ly/zALMqG |
0
|
Rajasthan |
Banswara Cement power station |
India Cements |
20 |
118,274 |
|
Proposed |
|
|
0 |
0
|
Rajasthan |
Banswara Thermal Power Station |
Rajasthan RV Utpadan Nigam |
1320 |
7,806,085 |
|
Proposed |
|
|
0 |
0
|
Rajasthan |
Barsingsar Thermal Power Project |
Neyveli Lignite Corporation |
375 |
2,217,638 |
|
Proposed |
|
|
http://bit.ly/xOBQ40 |
0
|
Rajasthan |
Bikaner power station |
OM Metals Infraprojects |
700 |
4,139,591 |
|
Early development |
|
|
http://bit.ly/zR9BMa |
0
|
Rajasthan |
Bithnok Thermal Power Project |
Neyveli Lignite Corporation |
250 |
1,478,425 |
|
Proposed |
|
|
http://bit.ly/xOBQ40 |
0
|
Rajasthan |
Bithnok thermal station |
Neyveli Lignite Corporation |
250 |
1,478,425 |
|
Proposed |
|
|
http://bit.ly/xOBQ40 |
0
|
Rajasthan |
Chhabra power station Unit 3-4 expansion |
Rajasthan RV Utpadan Nigam |
500 |
2,956,850 |
|
Construction |
2012 |
|
0 |
0
|
Rajasthan |
Chhabra power station Unit 3-4 expansion |
Rajasthan RV Utpadan Nigam |
1320 |
7,806,085 |
|
Proposed |
|
|
0 |
0
|
Rajasthan |
JSW Barmer (Jalipa Kapurdi) power station units 1-2 |
JSW Energy |
270 |
1,596,699 |
Subcritical |
Operating |
2010 |
Subcritical |
0 |
0
|
Rajasthan |
JSW Barmer (Jalipa Kapurdi) power station units 3-4 |
JSW Energy |
270 |
1,596,699 |
Subcritical |
Operating |
2011 |
Subcritical |
0 |
0
|
Rajasthan |
JSW Barmer (Jalipa Kapurdi) power station units 5-8 |
JSW Energy |
540 |
3,193,398 |
|
Construction |
2012 |
|
0 |
0
|
Rajasthan |
JSW Barmer (Jalipa Kapurdi) power station units 9-10 |
JSW Energy |
270 |
1,596,699 |
|
Advanced development |
2013 |
|
0 |
0
|
Rajasthan |
Kalisindh Thermal Power Station |
Rajasthan RV Utpadan Nigam |
1200 |
7,096,441 |
Supercritical |
Construction |
2012 |
Supercritical |
0 |
0
|
Rajasthan |
Kalisindh Thermal Power Station Stage II |
Rajasthan RV Utpadan Nigam |
1200 |
7,096,441 |
|
Proposed |
|
|
0 |
0
|
Rajasthan |
Kawai Thermal Power Project |
Adani Power |
1320 |
7,806,085 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/AAcNjp |
0
|
Rajasthan |
Sakhigopal Ultra Mega Power Project |
Power Finance Corporation |
4000 |
23,654,803 |
|
Proposed |
|
|
0 |
Sakhigopal Integrated Power Company
|
Rajasthan |
Suratgarh Super Thermal Power Station Unit 7-8 |
Rajasthan RV Utpadan Nigam |
1320 |
7,806,085 |
|
Early development |
|
|
0 |
0
|
Rajasthan |
Suratgarh Super Thermal Power Station Unit 9-10 |
Rajasthan RV Utpadan Nigam |
1320 |
7,806,085 |
Supercritical |
Early development |
|
Supercritical |
0 |
0
|
Rajasthan |
VS Lignite Plant |
KSK Energy Ventures |
135 |
798,350 |
|
Operating |
2010 |
|
http://bit.ly/wi5rWc |
0
|
Tamil Nadu |
Chennai power station I |
OPG Power Ventures |
77 |
455,355 |
Subcritical |
Operating |
2010 |
Subcritical |
0 |
0
|
Tamil Nadu |
Chennai power station II |
OPG Power Ventures |
77 |
455,355 |
Subcritical |
Construction |
2012 |
Subcritical |
0 |
0
|
Tamil Nadu |
Chennai power station III |
OPG Power Ventures |
160 |
946,192 |
Subcritical |
Advanced development |
2013 |
Subcritical |
0 |
0
|
Tamil Nadu |
Chennai power station III additional expansion |
OPG Power Ventures |
80 |
473,096 |
Subcritical |
Proposed |
|
Subcritical |
0 |
0
|
Tamil Nadu |
Cheyyur Ultra Mega Power Project |
Coastal Tamil Nadu Power |
4000 |
23,654,803 |
|
Proposed |
|
|
http://bit.ly/zfC7WM |
0
|
Tamil Nadu |
Cuddalore power station |
Cuddalore Powergen Corporation |
1320 |
7,806,085 |
0 |
Deferred |
0 |
0 |
http://bit.ly/xrMwSC |
0
|
Tamil Nadu |
Cuddalore SRM power station |
SRM Energy |
1980 |
11,709,128 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/zfC7WM |
0
|
Tamil Nadu |
Ennore power station expansion |
Tamil Nadu Generation and Distribution Corporation |
1200 |
7,096,441 |
|
Proposed |
|
|
0 |
0
|
Tamil Nadu |
Ennore SEZ Super Critical Thermal Power Project (Vayalur) |
Tamil Nadu Generation and Distribution Corporation |
1600 |
9,461,921 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
0
|
Tamil Nadu |
Jayamkondam power station |
Neyveli Lignite Corporation |
1600 |
9,461,921 |
|
Proposed |
|
|
http://bit.ly/xOBQ40 |
0
|
Tamil Nadu |
Marakkanam Super Thermal Power Project |
NTPC |
4000 |
23,654,803 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
0
|
Tamil Nadu |
Mettur Thermal Power Station Stage III |
TANGEDCO |
600 |
3,548,220 |
|
Construction |
2012 |
|
http://bit.ly/zfC7WM, http://bit.ly/z3czOO |
0
|
Tamil Nadu |
Nagai Power project (Nagapattinam) |
KVK Energy |
300 |
1,774,110 |
|
Construction |
2013 |
|
http://bit.ly/wokz9o |
0
|
Tamil Nadu |
New Neyveli Thermal Power Station |
Neyveli Lignite Corporation |
1000 |
5,913,701 |
|
Proposed |
2015 |
|
http://bit.ly/zDib7A |
0
|
Tamil Nadu |
Neyveli TPS-II Expansion unit 1 |
Neyveli Lignite Corporation |
250 |
1,478,425 |
|
Operating |
2011 |
|
http://bit.ly/xOBQ40 |
0
|
Tamil Nadu |
Neyveli TPS-II Expansion unit 2 |
Neyveli Lignite Corporation |
250 |
1,478,425 |
|
Construction |
2012 |
|
http://bit.ly/xOBQ40 |
0
|
Tamil Nadu |
North Chennai Thermal Power Station - Stage-II Unit 1 |
Tamil Nadu Generation and Distribution Corporation |
600 |
3,548,220 |
Subcritical |
Construction |
2012 |
Subcritical |
http://bit.ly/zfC7WM, http://bit.ly/xcv0CA |
0
|
Tamil Nadu |
North Chennai Thermal Power Station - Stage-II Unit 2 |
Tamil Nadu Generation and Distribution Corporation |
600 |
3,548,220 |
|
Construction |
2012 |
|
http://bit.ly/xyQz52 |
0
|
Tamil Nadu |
Savarimangalam power station |
SPR Infrastructure India |
2640 |
15,612,170 |
|
Early development |
|
|
http://bit.ly/x7HROk |
0
|
Tamil Nadu |
Thoothukudi power station (IBPGL) |
Ind-Barath Power |
126 |
745,126 |
0 |
Operating |
2010 |
0 |
http://bit.ly/A0aG34 |
0
|
Tamil Nadu |
Thoothukudi power station (IBPGL) expansion |
Ind-Barath Power |
63 |
372,563 |
0 |
Proposed |
0 |
0 |
0 |
0
|
Tamil Nadu |
Thoothukudi power station (IBTPL Hanakon replacement) |
Ind-Barath Power |
300 |
1,774,110 |
0 |
Proposed |
0 |
0 |
0 |
0
|
Tamil Nadu |
Tirunelveli power station |
India Cements |
50 |
295,685 |
|
Proposed |
|
|
0 |
0
|
Tamil Nadu |
Tuticorin power station (Coastal Energen) |
Coastal Energen |
1200 |
7,096,441 |
Subcritical |
Construction |
2013 |
Subcritical |
http://bit.ly/zfC7WM, http://bit.ly/zFcXSh |
0
|
Tamil Nadu |
Tuticorin power station (Coastal Energen) Phases II and III |
Coastal Energen |
1600 |
9,461,921 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/zFcXSh |
0
|
Tamil Nadu |
Tuticorin power station (Ind-Barath) Phase I |
Ind-Barath Power |
660 |
3,903,043 |
Supercritical |
Advanced development |
|
Supercritical |
http://bit.ly/wXRIKQ, http://bit.ly/xNByr3 |
0
|
Tamil Nadu |
Tuticorin power station (Ind-Barath) Phase II |
Ind-Barath Power |
660 |
3,903,043 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/wXRIKQ, http://bit.ly/xNByr3 |
0
|
Tamil Nadu |
Tuticorin Thermal Power Project |
Tamil Nadu Generation and Distribution Corporation and Neyveli Lignite Corp |
1000 |
5,913,701 |
|
Construction |
2013 |
|
http://bit.ly/xOBQ40 |
0
|
Tamil Nadu |
Udangudi power station |
Tamil Nadu Generation and Distribution Corporation and Bharat Heavy Electricals Limited |
1600 |
9,461,921 |
Supercritical |
Construction |
|
Supercritical |
http://bit.ly/zfC7WM |
0
|
Tamil Nadu |
Uppur power station (Thiruvadanai) |
Tamil Nadu Generation and Distribution Corporation |
1600 |
9,461,921 |
|
Unconfirmed |
|
|
http://bit.ly/yV54Sf |
0
|
Tamil Nadu |
Vallur I Phase-II |
NTPC and Tamil Nadu Generation and Distribution Corporation |
500 |
2,956,850 |
|
Construction |
2013 |
|
http://bit.ly/zfC7WM |
0
|
Tamil Nadu |
Vallur I power station |
NTPC and Tamil Nadu Generation and Distribution Corporation |
1000 |
5,913,701 |
|
Construction |
2012 |
|
http://bit.ly/zfC7WM |
0
|
Uttar Pradesh |
Amouli Fatehpur power station |
Uttar Pradesh Power Corporation and Neyveli Lignite Corporation |
2000 |
11,827,402 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
0
|
Uttar Pradesh |
Anpara power station (Lanco) |
Lanco |
1200 |
7,096,441 |
Subcritical |
Operating |
2011 |
Subcritical |
http://bit.ly/A67oWb |
0
|
Uttar Pradesh |
Anpara-C power station |
UP Rajya Vidyut Nigam Ltd |
1200 |
7,096,441 |
|
Operating |
2011 |
|
http://bit.ly/yYokdh |
0
|
Uttar Pradesh |
Anpara-D power station Unit I |
UP Rajya Vidyut Nigam Ltd |
500 |
2,956,850 |
|
Operating |
2011 |
|
http://bit.ly/yYokdh |
0
|
Uttar Pradesh |
Anpara-D power station Unit II |
UP Rajya Vidyut Nigam Ltd |
500 |
2,956,850 |
|
Construction |
|
|
http://bit.ly/yYokdh |
0
|
Uttar Pradesh |
Anpara-E power station |
UP Rajya Vidyut Nigam Ltd |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
0
|
Uttar Pradesh |
Auraiya IGCC power station |
NTPC and BHEL |
300 |
1,774,110 |
IGCC |
Deferred |
|
IGCC |
0 |
0
|
Uttar Pradesh |
Auraiya Unitech power station |
Unitech Machines |
250 |
1,478,425 |
|
Proposed |
|
|
0 |
0
|
Uttar Pradesh |
Bara Thermal Power Project Phase I |
Jaiprakash Power Ventures |
1980 |
11,709,128 |
|
Construction |
2015 |
|
http://bit.ly/zFF1C9, http://bit.ly/yLvtmM |
0
|
Uttar Pradesh |
Bara Thermal Power Project Phase II |
Jaiprakash Power Ventures |
1320 |
7,806,085 |
|
Proposed |
|
|
0 |
0
|
Uttar Pradesh |
Bargarh power station |
Bajaj Hindusthan |
1980 |
11,709,128 |
|
Proposed |
|
|
0 |
0
|
Uttar Pradesh |
Barkera Mill power station |
Bajaj Hindusthan |
80 |
473,096 |
|
Proposed |
|
|
0 |
0
|
Uttar Pradesh |
Bhognipur power station |
Lanco |
2640 |
15,612,170 |
|
Early development |
|
|
http://bit.ly/xXdfCd |
0
|
Uttar Pradesh |
Bilhaur Super Thermal Power Plant |
NTPC |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/yTVmcm |
0
|
Uttar Pradesh |
Chola power station |
Tata Power |
1320 |
7,806,085 |
|
Proposed |
|
|
0 |
0
|
Uttar Pradesh |
Dadri power station 5-6 |
NTPC |
980 |
5,795,427 |
Subcritical |
Operating |
2010 |
Subcritical |
0 |
0
|
Uttar Pradesh |
Dopaha Power station |
Uttar Pradesh Power Corporation |
1980 |
11,709,128 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/zISILj, http://bit.ly/zzBc5r |
0
|
Uttar Pradesh |
Fatehpur power station |
Uttar Pradesh Power Corporation |
1320 |
7,806,085 |
|
Proposed |
2015 |
|
http://bit.ly/xogsVL |
0
|
Uttar Pradesh |
Feroz Gandhi Unchahar Power Project Stage IV |
NTPC |
500 |
2,956,850 |
|
Proposed |
|
|
http://bit.ly/zgz2Px |
0
|
Uttar Pradesh |
Harduaganj TPS Extn - Stage III (Kasimpur) |
Uttar Pradesh Rajya Vidyut |
660 |
3,903,043 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/yfk4rM |
0
|
Uttar Pradesh |
Harduaganj TPS Extn -Stage II (Kasimpur) |
Uttar Pradesh Rajya Vidyut |
500 |
2,956,850 |
|
Operating |
2011 |
|
0 |
0
|
Uttar Pradesh |
Jawaharpur power station |
Jawaharpur Vidyut Utpadan Nigam |
1320 |
7,806,085 |
|
Proposed |
2013 |
|
http://bit.ly/wZM0tP |
0
|
Uttar Pradesh |
Lalitpur power project (Mirchawar) |
Bajaj Hindusthan |
1980 |
11,709,128 |
|
Early development |
2014 |
|
http://bajajhindusthan.com/mou_popup1.html |
0
|
Uttar Pradesh |
Meja power station |
NTPC and Uttar Pradesh Rajya Vidyut |
1320 |
7,806,085 |
Supercritical |
Construction |
2014 |
Supercritical |
http://bit.ly/zgz2Px, http://bit.ly/yofM4N |
0
|
Uttar Pradesh |
NCTPP IGCC demonstration (Dadri) |
NTPC |
100 |
591,370 |
|
Proposed |
|
|
http://bit.ly/AoGT0h |
0
|
Uttar Pradesh |
NCTPP Stage II (Dadri) |
NTPC |
980 |
5,795,427 |
|
Operating |
2010 |
|
http://bit.ly/AoGT0h |
0
|
Uttar Pradesh |
Obra thermal station extension |
UP Rajya Vidyut Nigam Ltd |
1600 |
9,461,921 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
was 1000
|
Uttar Pradesh |
Panki power station extension |
UP Rajya Vidyut Nigam Ltd |
250 |
1,478,425 |
|
Proposed |
|
|
http://bit.ly/yYokdh |
0
|
Uttar Pradesh |
Parichha power station |
Uttar Pradesh Rajya Vidyut |
500 |
2,956,850 |
|
Construction |
2011 |
|
http://bit.ly/yYokdh |
0
|
Uttar Pradesh |
Rihand III power station |
NTPC |
1000 |
5,913,701 |
|
Proposed |
|
|
0 |
0
|
Uttar Pradesh |
Rosa Phase I power station |
Reliance Power |
600 |
3,548,220 |
|
Operating |
2010 |
|
0 |
0
|
Uttar Pradesh |
Rosa Phase II power station |
Reliance Power |
600 |
3,548,220 |
|
Construction |
2012 |
|
0 |
0
|
Uttar Pradesh |
Singrauli Super Thermal Power Station Stage III |
NTPC |
500 |
2,956,850 |
|
Proposed |
|
|
http://bit.ly/zzBc5r |
0
|
Uttar Pradesh |
Tanda power station expansion |
NTPC |
1320 |
7,806,085 |
|
Proposed |
|
|
http://bit.ly/zHqjeV, http://bit.ly/zzBc5r |
0
|
Uttar Pradesh |
Welspun Ghazipur project |
Welspun Energy |
1320 |
7,806,085 |
0 |
Proposed |
2015 |
0 |
0 |
0
|
Uttar Pradesh |
Welspun Energy Mirzapur power station |
Welspun Energy |
1320 |
7,806,085 |
0 |
Early development |
|
West Bengal |
Adra Purulia power station |
NTPC and Indian Railways |
1320 |
7,806,085 |
|
Cancelled |
|
|
http://bit.ly/xF6wAx |
0
|
West Bengal |
Bakreswar Thermal Power Station Unit 6 |
West Bengal Power Development Corp. |
660 |
3,903,043 |
|
Proposed |
|
|
http://bit.ly/xBLyhO |
0
|
West Bengal |
Balagarh power station |
CESC |
1320 |
7,806,085 |
|
Proposed |
|
|
0 |
0
|
West Bengal |
Bankura Concast power station |
Concast Bengal Industries |
20.5 |
121,231 |
|
Proposed |
|
|
0 |
0
|
West Bengal |
Bhushan Steel West Bengal project |
Bhushan Steel |
1000 |
5,913,701 |
|
Deferred |
|
|
http://bit.ly/xbWxeF |
discussions with West Bengal govt
|
West Bengal |
Durgapur Projects Limited power station 7A extension |
Durgapur Projects Limited |
300 |
1,774,110 |
|
Proposed |
|
|
http://bit.ly/z9kbEU |
0
|
West Bengal |
Durgapur Steel City power station unit 1 |
Damodar Valley Corporation |
500 |
2,956,850 |
|
Operating |
2011 |
|
http://bit.ly/zaQOjW |
0
|
West Bengal |
Durgapur Steel City power station unit 2 |
Damodar Valley Corporation |
500 |
2,956,850 |
|
Construction |
2012 |
|
http://bit.ly/zaQOjW |
0
|
West Bengal |
Farakka power station Unit VI |
NTPC |
500 |
2,956,850 |
|
Operating |
2011 |
|
http://bit.ly/xJD8iV |
0
|
West Bengal |
Haldia Energy power station Phase 1 |
CESC |
600 |
3,548,220 |
|
Construction |
2014 |
|
http://bit.ly/w9xyjL |
0
|
West Bengal |
Haldia Energy power station phase 2 |
CESC |
1400 |
8,279,181 |
|
Proposed |
|
|
http://bit.ly/yiNWJp |
0
|
West Bengal |
Katwa Super Thermal Power Project (NTPC) |
NTPC |
1600 |
9,461,921 |
|
Deferred |
|
|
http://bit.ly/ygvr1V |
taken over from WBPDC
|
West Bengal |
Larsen & Tubro power station |
Larsen & Tubro |
3200 |
18,923,843 |
|
Proposed |
|
|
http://bit.ly/xF6wAx |
0
|
West Bengal |
Mejia power station phase II unit 1 |
Damodar Valley Corporation |
500 |
2,956,850 |
|
Operating |
2010 |
|
http://bit.ly/AFpEPa, http://bit.ly/xydlz4 |
0
|
West Bengal |
Mejia power station phase II unit 2 |
Damodar Valley Corporation |
500 |
2,956,850 |
|
Operating |
2011 |
|
http://bit.ly/xydlz4 |
0
|
West Bengal |
Raghunathpur power station phase 1 |
Damodar Valley Corporation |
1200 |
7,096,441 |
Subcritical |
Construction |
|
Subcritical |
http://bit.ly/wC5hqt, http://bit.ly/xjmhW7 |
delayed
|
West Bengal |
Raghunathpur power station phase II |
Damodar Valley Corporation |
1320 |
7,806,085 |
Supercritical |
Proposed |
|
Supercritical |
http://bit.ly/zzBc5r, http://bit.ly/wxTZbU |
0
|
West Bengal |
Sagardighi Thermal Power Station Phase II |
West Bengal Power Development Corp. |
1000 |
5,913,701 |
Subcritical |
Advanced development |
|
Subcritical |
http://bit.ly/yAusSL |
0
|
West Bengal |
Salboni 1 (CPP-IV) |
JSW Bengal Steel |
300 |
1,774,110 |
|
Construction |
2014 |
|
http://bit.ly/x4IBna |
0
|
West Bengal |
Salboni 2 |
JSW Energy |
660 |
3,903,043 |
Supercritical |
Advanced development |
2016 |
Supercritical |
0 |
0
|
West Bengal |
Salboni 3 |
JSW Energy |
660 |
3,903,043 |
Supercritical |
Advanced development |
2017 |
Supercritical |
0 |
0
|
West Bengal |
Santaldih power station unit 6 |
NTPC |
250 |
1,478,425 |
|
Operating |
2011 |
|
http://bit.ly/ygvr1V |
taken over from WBPDC
|