  • 'Last-ditch' pitch for valley's brown coal - The Age

The Napthine government will try to drum up interest in the vast but carbon-intensive brown coal reserves of the Latrobe Valley through a direct sales pitch to big mining companies. http://www.theage.com.au/victoria/lastditch-pitch-for-valleys-brown-coal-20130707-2pk97.html#ixzz2YP0QUOl2

  • Broken dreams: the 2002 brown coal promise - The Age

Australian Power and Energy Limited proposes a $6 billion plant turning coal into gas to manufacture 50,000 barrels of diesel a day and generate 500 megawatts of power. Project later sold to Monash Energy. Allocation reclaimed by government last year after project abandoned. http://www.theage.com.au/national/broken-dreams-the-2002-brown-coal-promise-20130707-2pk0g.html

  • Getting down to earth - The Age

Brown coal is a fact of life for Mark Bostedt. Born and raised at Morwell in the Latrobe Valley, he has lived all his 52 years in a locale dominated by it. He works in a power industry fuelled by it. But Bostedt is also a beef farmer at Driffield, just south of Morwell. Hazelwood power station is a backdrop to the farm he helps run, its turbines fed by the open-cut coal mine the boundary of which abuts the farm's lush pastures. For Bostedt, these paddocks, and others like them in the region, are the front in a battle for the future of "the Valley".

http://www.theage.com.au/national/getting-down-to-earth-20130707-2pk0h.html

Royce Millar, Tom Arup http://www.theage.com.au/victoria/loy-yang-in-lawsuit-over-blood-money-20130708-2pmcx.html#ixzz2afuvY7bA

Page update

Relocated off main page pending update

There is currently one major new coal fired power station -- the Dual Gas power station which, the Victorian government, is unlikely to proceed due to the lack of finance and the withdrawal of a $100 million federal government subsidy.

New Vic clips

cleanup

Statements that need references

  • C02CRC Otway Project: The project has an estimated cost of $4 million;[citation needed]
  • Latrobe Valley Post Combustion: The project has an estimated cost of $112.5 million;[citation needed]
  • CarbonNet: The project has an estimated cost of $30 million;[citation needed]
  • Latrobe Fertiliser Project: The project is currently on hold;[citation needed]

Tasks

  • update Hazelwood and Dual Gas pages
  • update Dual Gas page
  • details of Vic Energy White Paper
  • 2010 Vic election and coal

Vic coal

EV links

Climate Group

Company websites

Wikipedia articles

Notes

  • what is referred to as the Chemcal project near Bacchus March of Environmental Clean Technologies seems to be referring to what was the Coldry test plant of ECT.[1] However, ECT now refers to its Bacchus Marsh operation as its Matmor Test Plant for producing iron but the first stage of which was drying the brown coal using the Coldry technology. See [2]

ELF

Clean Coal Victoria

Latrobe Valley 2100 Coal Resources Project

Latrobe Valley 2100 Coal Resources Project - http://www.ret.gov.au/resources/industry_consultation/regional_minerals_programs/latrobe_valley_2100_coal_resources_project/Pages/LatrobeValley2100CoalResourcesProject.aspx

Energy for Victoria 2002


Strategic Policy Framework for Near Zero Emissions from Latrobe Valley Brown Coal 2007