Talk:Santee Cooper
Contents
Material on coal purchase controversy
Pee Dee Suspension
Moved off article page
The following unreferenced section was moved off the article page - it's not really all that useful for CoalSwarm.--Bob Burton 00:34, 30 March 2011 (UTC)
Santee Cooper Lakes
The Santee Cooper Power and Navigation Project, constructed in 1939, improved navigation on and provided hydroelectric power from the Santee and Cooper rivers in South Carolina. With the creation of Lake Marion and Lake Moultrie, the project was intended to improve the health, recreation, and economy of the area. At the time, the Santee Cooper Project was the largest land-clearing project in U.S. history, with over 12,500 workers clearing over 177,000 acres (720 km²) of swamp and forestland. 42 miles (68 km) of dams and dikes were constructed, including a 26-mile (42 km), 78-foot (24 m) tall earthen dike. The Pinopolis Dam included the hydroelectric station and navigation lock, the highest single-lift lock in the world. A 3,400-foot (1,000 m) spillway was built to control floodwaters, with 62 gates allowing overflow of excess water. In completing the largest earth-moving project in the nation's history, 42,000,000 cubic yards (32,000,000 m³) of earth were moved and 3.1 million cubic yards of concrete were poured.