An earlier proposal was for setting up 4 × 660 MW coal-based plants, but was later reduced to 2 × 800 MW units covering 1350 acres. The projected coal requirement is 7.5 million tonnes a year (MTPA), with plans to obtain the coal from the Talaipalli coal block. Water requirement of 4675m3/hr will be sourced from the Narmada river through a pipeline at a distance of about 30 km from the project site.<ref name=EC>[http://bit.ly/1lvKxUH Environmental Clearance,] MoEF, March 22, 2013.</ref>
Construction began in March 2014.<ref>[http://www.dnaindia.com/india/report-ntpc-to-construct-2640-mw-power-plant-in-bundelkhand-1966319 "NTPC to construct 2,640 MW power plant in Bundelkhand,"] DNA. Mar 2, 2014</ref> The project has a proposed commissioning date of 2017-2018.<ref name=ip>[http://ntpc.co.in/images/content/investors/AnalystMeet2013.pdf "NTPC Investor presentation,"] August 1, 2013.</ref><ref>[http://cea.nic.in/reports/monthly/broadstatus/2016/broad_status-03.pdf "Monthly Report on Broad Status of Thermal Power Projects in the Country,"] Government of India Ministry of Power, March 2016</ref> Construction began in March 2014.<ref>[http://wwwcea.dnaindianic.comin/reports/monthly/broadstatus/india2016/reportbroad_status-ntpc-to-construct-2640-mw-power-plant-in-bundelkhand-1966319 07.pdf "NTPC to construct 2,640 MW power plant Monthly Report on Broad Status of Thermal Power Projects in Bundelkhandthe Country,"] DNA. Mar 2Government of India Ministry of Power, 2014July 2016</ref>
==Project Details==
'''Capacity:''' 1,600 MW (Units 1-2: 800 MW)<br>
'''Type:''' <br>
'''Projected in service:''' 2017<ref name=ip/>(Unit 1), 2018 (Unit 2)<br>
'''Coal Type:''' 3900 kcal/kg<ref name=EC/><br>
'''Coal Source:''' Talaipalli coal block<ref name=EC/><br>