Romania and coal

1,685 bytes added, 01:34, 5 November 2012
* The [[Rovinari Power Station]] is a 1420 MW coal-fired power station in Gorj County, Romania. It was built in 1972 and is owned by SC Complexul Energetic Rovinari (owned in part by the Government of Romania). In May 2012 Rovinari selected China Huadian Engineering Co. Ltd to build a 500 megawatt (MW) coal-fired plant worth US$1.3 billion (1 billion euro) at the station. Rovinari and China Huadian plan to set up an independent power producer (IPP), which will implement the project. Rovinari plans to replace two 200 MW energy blocks at the station that are currently out of use.<ref>[http://powermarket.seenews.com/news/romanias-rovinari-picks-chinese-co-to-build-1-0-bln-euro-power-plant-274425 "Romania's Rovinari Picks Chinese Co to Build 1.0 Bln Euro Power Plant,"] Power Market, May 10, 2012.</ref>
 
==Coal plants slated for closure==
The following coal plants in Romania of 50MW or more have decided to opt-out of the EU Large Combusion Directive, meaning they must close down when their max 20,000 hours running time since January 2008 expires or at the end of 2015:<ref>[http://forum.eionet.europa.eu/x_reporting-guidelines/library/lcp_reporting/opted_out_plants/opted-out-plants-1-january-2012/download/1/Overview%202012%20%28web%20version%29.xls "Opted Out plants 1 January 2012"], European Environment Agency, October 2012.</ref>
 
*S.C.TERMOELECTRICA S.A - SE BORZESTI
*S.C. TERMON S.R.L. ONESTI
*S.C.TERMICA S.A.Suceava No. 2
*S.C.TERMICA S.A.Suceava No. 3
*S.C.TERMICA S.A.Suceava No. 4
*SC CET SA BRAILA NR.4
*SC ELCEN Bucuresti SE Palas nr.6
*SC ELCEN Bucuresti SE Palas nr.8
*S.C. ENET S.A. NR. 4
*Termoelectrica SA Buc. SE Doicesti (Gr. Energetic nr.8)
*S.C.PETROTEL-LUKOIL S.A NR.3 (CT)
*S.C. Complexul Energetic Craiova S.E. Craiova II -IMA 2
*S.C. Energetic Craiova S.E. Craiova II - IMA 3
*S.C. Energetic Craiova S.E. Craiova II - IMA 4
*SC Complexul Turceni SA nr.1
*SC Complexul Turceni SA nr.4
*RAAN - Suc. ROMAG TERMO, No.1
*TERMOELECTRICA SA Paroseni IMA Nr.1
*Electrocentrale Deva S.A IMA 1
*CET Arad No. 2
*CET Arad No. 5
*CET Arad No.6
*CET Arad No.7
*CET Arad No.10
*ELECTRICA ZALAU S.A. IMA Nr.3
*CET Brasov Nr.1
*SC ELCEN Bucuresti SE Mures No.2
*SC ELCEN Bucuresti SE Mures No.3
*SC ELCEN Bucuresti Grozavesti Nr.2
*SC ELCEN Bucuresti Grozavesti Nr.3
*SC ELCEN Bucuresti Grozavesti Nr.4
*SC ELCEN Bucuresti Grozavesti Nr.5
*SC ELCEN Bucuresti Sud Nr.6 and 7
*SC ELCEN Vest Nr.2
*SC ELCEN Bucuresti Vest Nr.3 - 6
*SC ELCEN Bucuresti Titan Nr. 1 and 2