− | {{#Badges:CoalSwarm|Navbar-Thailandcoal}} '''Krabi power station''' is a proposed 800-megawatt (MW) coal-fired power station planned for Krabi, Thailand. | + | {{Moved to GEM}} |
− | | |
− | ==Location==
| |
− | The map below shows the location of Krabi, the approximate location where the plant will be built.
| |
− | {{#display_point:8.059167, 98.918889|width=600|height=500|type=normal|zoom=12}}
| |
− | | |
− | ==Proposal==
| |
− | The project is being initiated by the Electricity Generating Authority of Thailand (EGAT). The 800-megawatt coal-fired power plant is planned for Krabi's Nua Khlong district, while the [[Ban Klong Rua coal port]] would be established at Ban Klong Ruo.<ref name=pg/><ref name=bp>[http://www.bangkokpost.com/lite/topstories/445025/egat-says-more-coal-fired-power-plants-needed "Egat says more coal-fired power plants needed,"] Nov 24, 2014</ref> The Thailand Power Development Plan for 2015-2036 forecasts the power station would be completed in 2019.<ref>[http://www2.eppo.go.th/power/PDP2015/PDP2015_Eng.pdf "Thailand Power Development Plan, 2015-2036,"] Thailand Ministry of Energy, May 2015</ref>
| |
− | | |
− | ==Background on Plant==
| |
− | According to a 2014 report by Greenpeace, the Ban Klong Ruo coal seaport project is a new plan by EGAT to find ways of transporting imported coal from Indonesia, Australia and Africa to its coal-fired power plant. Throughout the year, including the monsoon season, the unloading of coal from larger ships to smaller ones would take place at sea around Koh Lanta. The coal will be unloaded again at Ban Klong Ruo coal seaport to an 8.4 kilometre-long conveyer belt to deliver coal to the power plant.<ref name=pg>[http://www.phuketgazette.net/thailand-news/Phuket-Gazette-Thailand-News-Krabi-coal-plant-fight-heats-up-Senate-election-nears-Issara-assures-innocence/27796#sthash.IPBmqkaN.dpuf "Krabi coal plant fight heats up; Senate election nears,"] Phuket Gazette, March 10, 2014</ref>
| |
− | | |
− | In March 2013, activists and locals protested new coal plants in Thailand, including Krabi. The action followed a protest by 500 Krabi villagers on February 11 who claimed that a coal-fired plant in their area from 1964 to 1995 had left many of them with respiratory problems and cancer.<ref>Kritsada Mueanhawong, [http://www.phuketgazette.net/phuket_news/2013/Greenpeace-goes-over-the-edge-to-protest-Krabi-coal-plant-20599.html "Greenpeace goes over the edge to protest Krabi coal plant,"] Phuket Gazette, March 25, 2013.</ref>
| |
− | | |
− | In 2014 it was reported that villagers in the southern province of Krabi had come out in strong opposition to the planned project, saying it would cause pollution and damage eco-tourism industries which generate billions in baht for local people each year.<ref name=pg/>
| |
− | | |
− | In March 2015 the Thailand Government’s Office of Natural Resources and Environmental Policy and Planning (ONEP) rejected the Environmental Impact Assessment (EIA) report on the Ban Klong Rua coal seaport and the Krabi coal-fired power plant. A panel reviewing the EIA said it "does not present comprehensive information, nor does it incorporate all concerns from every sector." The Protect Krabi Network presented ONEP with 44,000 signatures from those who support the protection of the area where the coal seaport and coal-power plant would be located.<ref>[http://webcache.googleusercontent.com/search?q=cache:0FKCJm3sOmUJ:www.phuketgazette.net/phuket-news/Krabi-coal-plant-Environmental-Impact-Assessment-rejected/52561+&cd=1&hl=en&ct=clnk&gl=us#sthash.bIlde7rj.dpuf "Krabi coal plant Environmental Impact Assessment rejected,"] Phuket Gazette, March 14, 2015</ref>
| |
− | | |
− | After a well-publicized hunger strike against the plant, the Thai government agreed in July 2015 to set up a joint committee to review the environmental and health assessment of the project and consider renewable energy alternatives. While the coalition opposing the plant also wanted a freeze on a tender for the project's construction by the Electricity Generating Authority of Thailand, the government said bidding would proceed but promised that no contracts would be signed during the project's review.<ref>[http://www.nationmultimedia.com/national/Prayut-puts-Krabi-plant-on-hold-30265127.html "Prayut puts Krabi plant on hold,"] The Nation Multimedia, July 24, 2015</ref>
| |
− | | |
− | On August 5, 2015, two private consortiums submitted bids to construct the plant: one was a consortium comprising Italian-Thai Development Plc and Power Construction Corp of China, and the second was a joint venture between Alstom (Thailand) and Marubeni of Japan. Egat deputy governor Rattanachai Namwong said he expected the winning bidder would be announced in four months.<ref>[http://www.bangkokpost.com/business/news/645100/2-groups-bid-on-krabi-coal-plant "2 groups bid on Krabi coal plant,"] Bangkok Post, Aug. 5, 2015</ref><ref>[http://www.voanews.com/content/in-picturesque-thailand-coal-plant-draws-protests/1891079.html "In Picturesque Thailand, Coal Plant Draws Protests ,"] Voice of America, April 11, 2014.</ref>
| |
− | | |
− | In September 2015 EGAT said the plant would have only a small environmental impact on the area. The findings were immediately met with skepticism by many locals. The tripartite panel approved by the PM in July to review the project was still not set up because of delay caused by the abolition of the National Reform Council. The permitting consideration process is therefore still considered unfinished.<ref>[http://www.nationmultimedia.com/national/Krabi-power-plant-will-have-little-environmental-i-30268886.html "Krabi power plant 'will have little environmental impact'"] The Nation, Sep 16, 2015</ref>
| |
− | | |
− | In January 2016 the National Council for Peace and Order used Article 44 of the interim constitution to order an exemption to the city plan law for power plants and other industrial projects, which had been restricted to areas zoned for them on the city plan. The Protect Andaman from Coal Network responded by rallying in front of the Natural Resources and Environment Ministry against the order and urged the ministry to renew the Krabi Environment Protection Zone without any legal gap that would permit the building of a coal-fired plant in Krabi.<ref>[http://www.nationmultimedia.com/national/Anti-coal-groups-protest-against-latest-NCPO-order-30277821.html "Anti-coal groups protest against latest NCPO order,"] The Nation, January 27, 2016</ref> Order 9/2559 was issued on March 7, 2016, with the intention of speeding up construction of the government’s public utility projects, including power plants. The orders are issued by the prime minister, Gen Prayut, who seized power in May 2014.<ref>[http://www.mekongeye.com/2016/03/24/laying-down-the-dictator-law-for-money-2/ "Laying down the ‘dictator law’ for money,"] Bangkok Post, Mar 20, 2016</ref>
| |
− | | |
− | In July 2016 a consortium of France's Alstom Power Systems and Japan's Marubeni lost out on the project to Power Construction Corporation of China and a Thai partner. The winning bid of 32 billion baht for the plant was 10% lower than the French-Japanese proposal. If the project goes forward, it would be the first major Thai project carried out by a Chinese construction company, according to Nikkei Asia Review.<ref name=nikkei/>
| |
− | | |
− | In November 2016, almost a dozen activists shaved their heads in protest against the plant outside Government House.<ref>[http://www.bangkokpost.com/archive/activists-protest-krabi-power-plant/1139053 "Activists protest Krabi power plant,"] Bangkok Post, 19 November 2016</ref>
| |
− | | |
− | ==Terminal==
| |
− | The project would include a site for unloading coal shipments near Laem Hin, a scenic fishing village of 30 households. Residents of the village have joined in protesting the project, fearing disruption to their fishing activities.<ref name=nikkei>Hiroshi Kotani, [http://asia.nikkei.com/Business/Trends/Pollution-fears-fuel-furor-over-Thai-power-plant-project "Pollution fears fuel furor over Thai power plant project,"] Nikkei Asian Review, 2 November 2016</ref>
| |
− | | |
− | ==Alternatives==
| |
− | In March 2016 EGAT said if Krabi's coal-fired power plant cannot go ahead, the government may turn to gas-fired power plants and the country will need to import more LNG.<ref>[http://www.nationmultimedia.com/business/Electricity-Generating-eyes-LNG-business-30281105.html "Electricity Generating eyes LNG business,"] The Nation, March 9, 2016</ref> The 1,000 MW coal-fired [[Panare power station]] in Pattani province has also been proposed as a potential alternative to Krabi or [[Thepha power station]].<ref name=nat>[http://www.nationmultimedia.com/national/Locals-in-South-lack-details-on-coal-plants-30283699.html "Locals in South ‘lack details on coal plants,’"] The Nation, April 11, 2016</ref>
| |
− | | |
− | ==Project Details==
| |
− | *'''Sponsor:''' Electricity Generating Authority of Thailand (EGAT)
| |
− | *'''Location:''' Nua Khlong district, Krabi
| |
− | *'''Coordinates:''' 8.059167, 98.918889 (approximate)
| |
− | *'''Status:''' Pre-permit development
| |
− | *'''Capacity:''' 800 MW
| |
− | *'''Type:'''
| |
− | *'''Projected in service:''' 2019
| |
− | *'''Coal Type:''' Sub-bituminous
| |
− | *'''Coal Source:''' Indonesia and South Africa
| |
− | *'''Source of financing:'''
| |
− | | |
− | ==Articles and resources==
| |
− | ===References===
| |
− | <references/>
| |
− | | |
− | ===Related SourceWatch articles===
| |
− | *[[Thailand and coal]]
| |
− | | |
− | ===External resources===
| |
− | | |
− | [[Category: Proposed coal plants in Thailand]]
| |
− | [[Category: Proposed coal plants in Asia]]
| |
− | [[category:Energy]]
| |
− | [[category:Thailand]]
| |