==Location==
 
The map below shows Gadarwara tehsil, Narsinghpur district, Madhya Pradesh, the location where the plant will be built.
 {{#display_point:22.934365,78.780785|width=500600|height=400500|type=normal|zoom=8}}
==Background==
An earlier proposal was for setting up 4 × 660 MW coal-based plants, but was later reduced to 2 × 800 MW units covering 1350 acres. The projected coal requirement is 7.5 million tonnes a year (MTPA), with plans to obtain the coal from the Talaipalli coal block. Water requirement of 4675m3/hr will be sourced from the Narmada river through a pipeline at a distance of about 30 km from the project site.<ref name=EC>[http://bit.ly/1lvKxUH Environmental Clearance,] MoEF, March 22, 2013.</ref>
An earlier proposal was for setting up 4 × 660 MW coal-based plants, but was later reduced to 2 × 800 MW units covering 1350 acres. The projected coal requirement is 7.5 million tonnes project has a year (MTPA), with plans to obtain the coal from the Talaipalli coal block. Water requirement proposed commissioning date of 4675m3/hr will be sourced from the Narmada river through a pipeline at a distance of about 30 km from the project site2017.<ref name=ECip>[http://bitntpc.co.lyin/images/content/investors/1lvKxUH Environmental ClearanceAnalystMeet2013.pdf "NTPC Investor presentation,"] MoEF, March 22August 1, 2013.</ref>
==Project Details==
* Unit 2: 800 MW<br>
'''Type:''' <br>
'''Projected in service:''' 2017<ref name=ip/><br>
'''Coal Type:''' 3900 kcal/kg<ref name=EC/><br>
'''Coal Source:''' Talaipalli coal block<ref name=EC/><br>