Difference between revisions of "Twin Oaks Power Unit 3"

From SourceWatch
Jump to navigation Jump to search
(SW: plant cancelled)
(SW: SW: cat fix)
Line 31: Line 31:
 
* [http://www.sierraclub.org/environmentallaw/coal/plantlist.asp "Stopping the Coal Rush"], Sierra Club, accessed January 2008. (This is a Sierra Club list of new coal plant proposals.)
 
* [http://www.sierraclub.org/environmentallaw/coal/plantlist.asp "Stopping the Coal Rush"], Sierra Club, accessed January 2008. (This is a Sierra Club list of new coal plant proposals.)
  
[[Category: Texas proposed coal plants]][[Category: Energy]][[Category: Cancelled US coal plant proposals]]
+
[[Category: Proposed coal plants in Texas]][[Category: Energy]]

Revision as of 00:36, 11 September 2008

{{#badges: CoalSwarm}} Sempra Generation, a subsidiary of Sempra Energy, proposed a 600 MW power plant as a third generating unit at its 350 MW Twin Oaks Power Plant in Bremond, TX.[1] Sempra Generation filed for an air permit with the Texas Commission on Environmental Quality in July 2005; as of Dec. 2007, the permit was still pending.[2]

In April 2006, PNM Resources acquired the plant from Sempra. In June 2007, PNM Resources entered a joint venture (along with Bill Gates’s Cascade Investments) with EnergyCo, passing on the power contracts of the current and future Twin Oaks units to EnergyCo.[3]

In August 2008, PNM announced that it would not pursue the Twin Oaks expansion. No reason was given for the cancellation.[4]

Project Details

Sponsor: EnergyCo
Location: Bremond, Robertson County, TX
Capacity: 600 MW
Type: Conventional lignite
Projected in service: 2011
Status: Cancelled